4 floors · 64,000 sq ft · built 1905 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3406). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 64,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT(3RD FL)STAIR C (BASEMENT)STAIR G, D DOORS ARE IN DISREPAIR/RACKED. REMEDY: REPAIR AND/OR REPLACE. #35731634Z | Jun 12, 2026 POP/IN-VIO | $0 |
| May 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (1ST FL) RM 112 WATER DAMAGE/STAINING TO CEILING/WALL WITH SPALLING OF PLASTER/PAINT. REMEDY: REPAIR AND/OR REPLACE. #35731633R | Jun 12, 2026 POP/IN-VIO | $0 |
| May 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (BASEMENT)GYM, CAFETERIA(2ND FL) AUDITORIUM EMERGENCY LIGHTS #35731636M | Jun 12, 2026 POP/IN-VIO | $0 |
| May 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT (2ND FL)LIBRARY RM 208A WITHOUT EMERGENCY LIGHT #35731635K | Jun 12, 2026 POP/IN-VIO | $0 |
| May 6, 2026 | Construction CLASS - 2 REISSUE ECB #35717421Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (BASEMENT)CAFETERIA/KITCHEN NOT INSTALLED/PROVIDED WITHOUT ANSUL FIRE SUPPRESSION. REMEDY: REPAIR AND/OR REPLACE. #35731632P | Jun 12, 2026 POP/IN-VIO | $0 |
| May 7, 2025 | Construction CLASS - 2 REISSUE #35677568P: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT BASEMENT LEVEL CAFETERIA/KITCHEN GAS STORE CONTINUE SERVICE WITHOUT ANSUL SYSTEMS WHICH PREVENTING FIRE UNDER COMMERCIAL FLOOR. REME #35717421Y | Jun 5, 2025 POP/IN-VIO | $0 |
| May 10, 2024 | Construction CLASS - 2 REISSUE #35672708P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION, I OBSERVED AT THE CAFETERIA KITCHEN 10 BURNER GAS STOVE DO NOT HAVE AN ANSUL SYSTEM NEED TO PROVIDE A FIRE SU #35677568P | Jun 20, 2024 POP/IN-VIO | $0 |
| Mar 16, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT CAFETERIA KITCHEN,10 BURNER GAS STOVE DO NOT HAVE AN ANSUL SYSTEM.REMEDY:PROVIDE FIRE SUPRESSION SYSTEM TO GAS STOVE. #35672708P | Jun 21, 2023 POP/IN-VIO | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:36 PM ET. BBL 3034060001.