2 floors · 3 apartments · 2,440 sq ft · built 1930 · class C0 · owner of record: Muncan As To An Und 82%, Petar
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 25, 2010 | Construction CLASS - 3 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. JOB #410119367/A2/DWGS. DATED 6.3.09. PERMIT EXPIRED 11.3.08. NOTED: 1) 1ST FLR FRONT WINDOW INSTALLED OPAQUE ROLL DOWN SHUTTER #34751193Y | Mar 16, 2010 IN VIOLATION | $0 |
| Oct 22, 2008 | Unknown CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION W/ THE DOB FOR VIOLATIONS #34644557M,#34644568H,#34644556K. REMEDYFILE CERT OF CORRECTION. #34703758X | Dec 16, 2008 IN VIOLATION | $0 |
| Apr 18, 2008 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR FACADE MISSING BRICK MORTOR AND 2 CRACKS STORM DRAIN NOT CONNECTED TO SUBGRADE INTERIOR 3 NO CELLAR RAILINGS REMEDY: MAINTAIN BLDG AS PER CODE #34644556K | Jun 10, 2008 IN VIOLATION | $0 |
| Apr 18, 2008 | Construction Non-Hazardous WORK W/O A PERMIT HAZARDOUS CELLAR REMOVAL OF CELLAR COLUMNS INSTALLATION OF CENTER SUPPORT AT CELING REMEDY: PROVIDE STRUCTURAL ENGINEERS REPORT OBTAIN PERMIT #34644568H | Jun 17, 2008 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 12:39 PM ET. BBL 4038440024.