Brooklyn · Block 759 · Lot 7501 · 11220

779 47th Street

7 floors · 14 apartments · 19,278 sq ft · built 2019 · class RM · owner of record: Hang Hui Realty Llc

9open violations
$7,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 120 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $7,500 owed
IssuedViolationHearingBalance
Aug 3, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE) FOR TRANSIENT USE A
#35729431X
May 6, 2027
PENDING
$2,500
Aug 3, 2026Construction CLASS - 1
BC 907.2.8. FAILURE TO PROVIDE FIRE ALARM SYSTEM CLASS "J" FOR TRANSIENT USE AT APT 6A. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY.
#35729432H
May 6, 2027
PENDING
$2,500
Aug 3, 2026Quality of Life CLASS - 2
PERMANENT DWELLING OFFERED/USED/CONVERTED FOR OTHER PERMANENT RESIDENTIAL PURPOSES, DEPT OF BUILDINGS RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED AS A CLASS "A" MULTIPLE DWELLING. ILLEGAL OCCUPANCY NOTED:
#35729430Y
May 6, 2027
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 3, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE) FOR TRANSIENT USE AOpen
Aug 3, 2026ECBConstruction: BC 907.2.8. FAILURE TO PROVIDE FIRE ALARM SYSTEM CLASS "J" FOR TRANSIENT USE AT APT 6A. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY.Open
Aug 3, 2026ECBQuality of Life: PERMANENT DWELLING OFFERED/USED/CONVERTED FOR OTHER PERMANENT RESIDENTIAL PURPOSES, DEPT OF BUILDINGS RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED AS A CLASS "A" MULTIPLE DWELLING. ILLEGAL OCCUPANCY NOTED:Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 4:08 PM ET. BBL 3007597501.

Look up another building