3 floors · 12 apartments · 9,300 sq ft · built 1931 · class C7 · owner of record: Namdar Elton Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-08 (Accepted). Agency page | Dec 31, 2026 in 50 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39085221M ISSUED ON 05/02/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032929X | Apr 18, 2025 IN VIOLATION | $1,250 |
| May 8, 2023 | Boilers CLASS - 1 FTM B-254 FOUND AN OIL FIRED BOILER WEIL MC LAIN#580 WITH THESE VIOLATING CONDITIONS. HOLES THROUGH OUT BOILER ROOM ,EXPOSED WIRES,BOTTOM SECTIONS LEAKING CORRECT ALL AND SUBMIT CERT.OF CORRECTIONS #39085737N | Jul 21, 2023 IN VIOLATION | $0 |
| May 2, 2023 | Boilers CLASS - 2 FLUE PIPE HAS TO BE RESEAL AROUND CHIMNEY/WATER PIPE HAVE TO BE SUPPORTED/CORRECT ALL VIOLATING CONDITIONS/SUBMIT CERTIFICATE OF CORRECTIONS #39085221M | Jul 7, 2023 STIPULATION/IN-VIO | $315 |
| Issued | Violation | Status |
|---|---|---|
| Nov 19, 1998 | CONSTRUCTION #012SC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 18, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS AND COMPONENTS AT ALL FLOORS AT 1ST FIRE ESCAPE FROM SOUTH AT EAST BUILDING FRONT AT FIRE ESCAPE | Sep 21, 2026 |
| Dec 10, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURES AT PUBLIC HALL, 1st STORY | Jan 14, 2026 |
| Dec 10, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT SOUTH WALL FIRE RETARDANT MATERIALS AT PUBLIC HALL, 2nd STORY | Jan 14, 2026 |
| Mar 7, 2025 | C | § 27-2005 ADM CODE PROVIDE INCASE OF POWER OUTTAGE A HEAVY DUTY MECHANICAL LOCK AT DOOR FROM STREET FROM 1ST STORY PUBLIC HALL | Mar 13, 2025 |
| Oct 28, 2024 | C | § 27-2005 ADM CODE PROVIDE MORTISE LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Nov 3, 2024 |
| Oct 28, 2024 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ELECTRICAL MAGNETIC LOCKING DEVICE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Nov 3, 2024 |
| Nov 1, 2023 | C | Apt 2E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 40 SQ FT AT EAST WALL APPROX 40 SQ FT AT NORTH WALL APPROX 40 SQ FT AT WEST WALL APPROX 40 SQ FT AT SOUTH WALL APPROX 30 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH | Nov 27, 2023 |
| Oct 24, 2023 | C | Apt 2E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 8 SQFT), AT NORTH WALL (APPROX 8 SQFT), AT EAST WALL (APPROX 6 SQFT), AT SOUTH WALL (APPROX 8 SQFT) AND WEST WALL (APPROX 6SQFT) IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NO | Nov 19, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 12:49 PM ET. BBL 2023790026.