2 floors · 2 apartments · 3,916 sq ft · built 1905 · class S2 · owner of record: 777 Shg Burke Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 3, 2025 | Unknown CLASS - 1 I OBSERVED IN THE BASEMENT THE WATER GROUND ELECTRODE WIRE IS NOT INSTALLED FROM THE WATER MAIN TO THE ELECTRICAL SERVICE, PROVIDE GROUNDING., PROVIDE GROUNDING #39134397Y | Jan 6, 2026 DEFAULT | $12,000 |
| Jan 3, 2025 | Unknown CLASS - 2 I OBSERVED THROUGHOUT THE SECOND FLOOR APARTMENT SEVERAL OUTLETS AND LIGHT FIXTURES. I OBSERVED IN THE OPEN PANEL BOXES AND EXPOSED WIRES., COMPLY WITH EC #39134399H | Jan 6, 2026 DEFAULT | $4,000 |
| Jan 3, 2025 | Unknown CLASS - 2 I OBSERVED NEW ELECTRICAL BUILDOUT IN THE BASEMENT, 1F, 1R, NEW OUTLETS SWITCHES LIGHT FIXTURES AND BRANCH WIRING. NO APPLICATION ON FILE WITH D.O.B., OBTAIN PERMIT. APPLICATION NUMBERS X01062902 DOES NOT COVER #39134398X | Jan 6, 2026 DEFAULT | $4,000 |
| Jan 3, 2025 | Unknown CLASS - 2 I OBSERVED THROUGHOUT THE 2ND FLOOR THE IMPROPER USE OF ELECTRICAL EXTENSION CORDS TO POWER UP APPLIANCES, LIGHTING, AND ELECTRONICS DUE TO THE LACK OF OPERABLE DEVICES IN THE APARTMENT; 400.8 NEC, COMPLY WITH #39134484M | Apr 4, 2025 DEFAULT | $4,000 |
| Jan 2, 2025 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. UPON INSPECTION, I OBSERVED AT EXP.1/FRONT, THE VACATE STICKER POSTED ON 02-26-2024, UNDER COMPLAINT 2387036 WITH VIOLATION 39107064M HAS SINCE BEEN REMOVED FRO #39134243L | Jan 6, 2026 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06517 | DOB VIOLATION - ACTIVE |
| Aug 22, 2024 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT THE 2 STORY WOOD FRAMED STRUCTURE SUS TAINED DAMAGE TO THE 2ND FLOOR PATIO AWNING DUE TO DEBRIS FALLING FRO M THE ADJACENT SITE AT TEH 779 BURKE AVENUE #CER01JK | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 16, 2026 | C | Apt 1R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2 | Oct 10, 2026 |
| Sep 16, 2026 | A | Apt 1R · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 20, 2026 |
| Sep 16, 2026 | A | Apt 1R · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 20, 2026 |
| Sep 16, 2026 | C | Apt 1R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2n | Oct 10, 2026 |
| Sep 16, 2026 | C | Apt 1R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT | Oct 10, 2026 |
| Sep 16, 2026 | C | Apt 1R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd | Oct 10, 2026 |
| Sep 16, 2026 | A | Apt 1R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 20, 2026 |
| Sep 16, 2026 | A | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR 508 EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 20, 2026 |
| Jan 8, 2025 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS, ALL WALLS, DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 13, 2025 |
| Jan 6, 2025 | C | Apt 2 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 4, 2025 |
| Jan 6, 2025 | C | Apt 2 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES NO ELECTRICITY TO ALL CEILING LIGHT FIXTURES AND WALL OUTLETS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 12, 2025 |
| Mar 28, 2024 | C | Apt 1R · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 28, 2024 |
| Dec 15, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR COLUMN FROM WEST AT BUILDING FRONT | Jan 19, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2 | Open |
| Sep 16, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Sep 16, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Sep 16, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2n | Open |
| Sep 16, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT | Open |
| Sep 16, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd | Open |
| Sep 16, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Sep 16, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR 508 EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 9:41 AM ET. BBL 2046030027.