4 floors · 8 apartments · 9,960 sq ft · built 1931 · class C1 · owner of record: Jefferson Estate Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 22, 2026 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER AS PER 28-207.4 NOTED: AT APT. 3L AT 3RD FLOOR HAS BEEN REOCCUPIED DESPITE ACTIVE VACATE ORDER #B238 ISSUED ON 05/01/2018. REMEDY: COMPLY WITH VACATE ORDER. #35720475R | Feb 4, 2027 | $10,000 |
| Jan 22, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT THE MAIN EXIT BY THE STAIR BY MAIN DOOR HAS BEEN OBSTRUCTED BY KIDS STROLLER, FULLLY LOADED SHOPPING CART MOPED CREATING A HAZARDOUS CONDITION. REMEDY: #35720476Z | Feb 4, 2027 | $2,500 |
| Dec 5, 2025 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER ISSUED ON 05/02/2018. NOTED: APT # 3L OCCUPIED BY TWO ADULTS AND ONE CHILD AT TIME OF INSPECTION., COMPLY WITH VACATE ORDER #39169545R | Dec 10, 2026 | $25,000 |
| Jan 29, 2025 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER AS PER 28-207.4. NOTED: APARTMENT 3L(3RD FLOOR) IS FULLY OCCUPIED AT TIME OF INSPECTIONBY PERMANENT TENANTS AND DISOBEY VACATE ORDER SINCE 05/01/2018 AND VAC #35684505N | Dec 10, 2026 | $12,000 |
| Nov 4, 2024 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER AS PER 28-207.4.NOTED:AT TIME OF INSPECTION AT 3RD FLOOR UNIT#3L WAS BEING OCCUPIED BY 8 LONG TERM TENANTS THERE BY DISOBEYING VACATE ORDER#B238/18 ISSUED ON #35684132J | Feb 2, 2027 | $12,000 |
| Nov 4, 2024 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:AT TIME OF INSPECTION ACTIVE VACATE ORDER#B238/18 ISSUED ON 05/01/2018 AND STICKER HAVE BEEN REMOVED FROM FRONT ENTRY DOOR OF BUILDING AND VACATE STICKER R #35684131H | Feb 2, 2027 | $6,250 |
| May 1, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. FAILURE TO PROVIDE # OF REQUIRED MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1;BC 1021.1 & 27-366 FOR TRANSIENT USE. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY. #35329607H | May 14, 2019 IN VIOLATION | $2,500 |
| May 1, 2018 | Quality of Life CLASS - 1 DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADDITIONAL DWELLING UNITS THNA LEGALLY AUTHORIZED BY THE OFFICAL RECORDS. NOW APT#3L ILLEGALLY CONVERTED INTO 5 UNITS W/KEY LOCK. TRANSIENTLY USE. #35329606X | May 13, 2019 IN VIOLATION | $6,000 |
| May 1, 2018 | Construction CLASS - 1 SEC. 907.2.8 FAILRUE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY. #35329608J | May 14, 2019 IN VIOLATION | $625 |
| May 1, 2018 | Construction CLASS - 1 FAILRUE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. FAILURE TO COMPLY W/MAXIMUM FLOOR AREA REQUIREMENT PER OCCUPANT LOAD MDL SEC#31 & HMC 27-2075. NOTED: APT#3L OCCUPIED AS A TRANSIENT/HOSTER W/2 BUNK BEDS IN RM #35329610Z | May 14, 2019 IN VIOLATION | $312 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #37013 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 8:14 AM ET. BBL 3016580012.