6 floors · 62 apartments · 65,220 sq ft · built 1953 · class D1 · owner of record: Hf 7705 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 65,220 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 429 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6253). Agency page | Dec 31, 2033 in 2621 days | Next due 2033 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 27, 2026 | Elevators CLASS - 2 1) CLEANING OF OIL LEAKAGE ON TOP OF CAR. 2) REPAIR PATCH AND SEAL HOIST MACHINE/HOIST MOTOR. #39197738L | Oct 7, 2026 DEFAULT | $655 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 23, 2025 | C | Apt 4G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' | Nov 18, 2025 |
| Oct 23, 2025 | A | Apt 4G · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER, AT EAST WALL IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' | Jan 26, 2026 |
| Oct 23, 2025 | B | Apt 4G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT EAST, WEST, AND SOUTH WALLS , AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' | Nov 27, 2025 |
| Oct 23, 2025 | B | Apt 4G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' | Nov 27, 2025 |
| Oct 10, 2024 | C | Apt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 5, 2024 |
| Feb 12, 2024 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 9, 2024 |
| Aug 15, 2022 | B | Apt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 19, 2022 |
| Jul 7, 2022 | B | Apt 5B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 11, 2022 |
| Jun 29, 2022 | C | Apt 1H · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 3, 2022 |
| Jun 29, 2022 | C | Apt 1H · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 3, 2022 |
| Aug 16, 2021 | C | Apt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2021 |
| Aug 16, 2021 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 11, 2021 |
| Jul 29, 2021 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 24, 2021 |
| Feb 22, 2021 | C | Apt 4G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 20, 2021 |
| Jan 16, 2020 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 6, 2020 |
| Sep 28, 2016 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING & NORTH WALL. IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2016 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 27, 2026 | ECB | Elevators: 1) CLEANING OF OIL LEAKAGE ON TOP OF CAR. 2) REPAIR PATCH AND SEAL HOIST MACHINE/HOIST MOTOR. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 2:16 AM ET. BBL 3062530001.