Brooklyn · Block 6253 · Lot 1 · 11214

7705 Bay Parkway

6 floors · 62 apartments · 65,220 sq ft · built 1953 · class D1 · owner of record: Hf 7705 Llc

17open violations
$655ECB/OATH penalties owed
10HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 65,220 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6253). Agency page

Dec 31, 2033
in 2621 days
Next due 2033
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $655 owed
IssuedViolationHearingBalance
Jul 27, 2026Elevators CLASS - 2
1) CLEANING OF OIL LEAKAGE ON TOP OF CAR. 2) REPAIR PATCH AND SEAL HOIST MACHINE/HOIST MOTOR.
#39197738L
Oct 7, 2026
DEFAULT
$655
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (16) · C 10 · B 5 · A 1
IssuedClassViolationCorrect by
Oct 23, 2025CApt 4G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST''Nov 18, 2025
Oct 23, 2025AApt 4G · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER, AT EAST WALL IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST''Jan 26, 2026
Oct 23, 2025BApt 4G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT EAST, WEST, AND SOUTH WALLS , AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST''Nov 27, 2025
Oct 23, 2025BApt 4G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST''Nov 27, 2025
Oct 10, 2024CApt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 5, 2024
Feb 12, 2024CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 9, 2024
Aug 15, 2022BApt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTHSep 19, 2022
Jul 7, 2022BApt 5B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 11, 2022
Jun 29, 2022CApt 1H · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jul 3, 2022
Jun 29, 2022CApt 1H · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Jul 3, 2022
Aug 16, 2021CApt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTSep 11, 2021
Aug 16, 2021CApt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTSep 11, 2021
Jul 29, 2021CApt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 24, 2021
Feb 22, 2021CApt 4G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMar 20, 2021
Jan 16, 2020CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 6, 2020
Sep 28, 2016BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING & NORTH WALL. IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2016

Issued in the last 120 days

DateSourceWhatNow
Jul 27, 2026ECBElevators: 1) CLEANING OF OIL LEAKAGE ON TOP OF CAR. 2) REPAIR PATCH AND SEAL HOIST MACHINE/HOIST MOTOR.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 2:16 AM ET. BBL 3062530001.

Look up another building