6 floors · 100 apartments · 93,096 sq ft · built 1963 · class D4 · owner of record: 770 Owners Corp/ Medallion Real Estate
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 93,096 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6503). Agency page | Dec 31, 2033 in 2625 days | Next due 2033 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTION FOR VIOLATION #37031288K ISSUED ON 12/02/2024 FOR FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPEC #39197944M | Apr 8, 2027 | $1,250 |
| Jul 21, 2026 | Unknown CLASS - 2 ATOI OBSERVED 2 SPLIT AC CONDENSER UNIT AT EXPOSURE #1.WITH DISCONNECT BOX WITH NO PERMIT ON PERMIT OR JOB FILING WITH THE DEPARTMENT OF BUILDINGS., OBTAIN PERMIT #39197075J | Nov 18, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #13698 | DOB VIOLATION - ACTIVE |
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911605 | DOB VIOLATION - ACTIVE |
| Jan 9, 2020 | FACADE SAFETY PROGRAM UNSAFE REPORT FILED #HAZ78527 | DOB VIOLATION - ACTIVE |
| Jan 9, 2020 | FACADE SAFETY PROGRAM UNSAFE REPORT FILED #HAZ88528 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #01165 | DOB VIOLATION - ACTIVE |
| Dec 4, 2009 | LL11/98-LOCAL LAW 11/98 - FACADE #HAZ2622 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF46009 | DOB VIOLATION - ACTIVE |
| Sep 7, 2001 | CONSTRUCTION WORK WITHOUT A PERMIT . WORK NOTED: STRUCTURE APPROXIMATELY 10' HIGH AND 12' HIGH AND 12' WIDE ERECTED IN SOUTH SIDE EASEMENT.(COURT YARD) REMEDY: OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION #14HS05 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jan 9, 2020 | Facades FISP UNSAFE REPORT FILED | Active |
| Jan 9, 2020 | Facades FISP UNSAFE REPORT FILED | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Dec 4, 2009 | Facades LL11/98 CYCLE 6 UNSAFE REPORT FILED | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 30, 2023 | B | Apt 7F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE NORTH AND EAST WALLS (APPROX. 6 SQ. FT.) IN THE 1st ROOM FROM EAST LOCATED AT APT 7F, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16137504 ISSUED 28-JUL-23 HAS BEEN UPGRADED TO CLASS B PER | Jan 4, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: FAILURE TO CERTIFY CORRECTION FOR VIOLATION #37031288K ISSUED ON 12/02/2024 FOR FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPEC | Closed |
| Jul 21, 2026 | ECB | Unknown: ATOI OBSERVED 2 SPLIT AC CONDENSER UNIT AT EXPOSURE #1.WITH DISCONNECT BOX WITH NO PERMIT ON PERMIT OR JOB FILING WITH THE DEPARTMENT OF BUILDINGS., OBTAIN PERMIT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 7:34 PM ET. BBL 3065030008.