Staten Island · Block 2450 · Lot 7511 · 10314

77 Stone Lane

2 floors · 110 apartments · 125,117 sq ft · built 1980 · class R3 · owner of record: Eva Duwe

140open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2025-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 125,117 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1156 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2450). Agency page

Dec 31, 2030
in 1521 days
Next due 2030

Open violations

ECB / OATH (0)

None open.

DOB (14)
IssuedViolationStatus
Feb 2, 2018FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00394
DOB VIOLATION - ACTIVE
Nov 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00465
DOB VIOLATION - ACTIVE
Aug 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00604
DOB VIOLATION - ACTIVE
May 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01134
DOB VIOLATION - ACTIVE
Feb 2, 2017FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00443
DOB VIOLATION - ACTIVE
Nov 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00521
DOB VIOLATION - ACTIVE
Aug 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00705
DOB VIOLATION - ACTIVE
Jun 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01068
DOB VIOLATION - ACTIVE
Feb 2, 2016FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00604
DOB VIOLATION - ACTIVE
Nov 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00723
DOB VIOLATION - ACTIVE
Aug 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01045
DOB VIOLATION - ACTIVE
May 2, 2015FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01537
DOB VIOLATION - ACTIVE
May 1, 2014FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00707
DOB VIOLATION - ACTIVE
Jan 1, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03035
DOB VIOLATION - ACTIVE
DOB NOW Safety (125)
IssuedViolationStatus
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active

Showing 60 of 125. Full list on the agency site.

HPD (1) · C 0 · B 0 · A 0
IssuedClassViolationCorrect by
Nov 26, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—

Issued in the last 120 days

DateSourceWhatNow
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open
Aug 6, 2026DOB SafetyGHG Emissions - LL97: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 10:15 AM ET. BBL 5024507511.

Look up another building