14 floors · 106 apartments · 110,958 sq ft · built 1924 · class R4 · owner of record: 77 Park Ave Condo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 110,958 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 894). Agency page | Dec 31, 2034 in 2984 days | Next due 2034 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2026-08-24) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 26, 2026 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO CRACKS IN THE TERRACOTTA AT EXPOSURE 4 OF STRUCTURE., REPAIR AND/REPLACE #39197653M | Apr 8, 2027 PENDING | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 1, 1994 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 24, 2026 | B | Apt 10D · § 27-2005 HMC: REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM WEST AT NORTH. IN THE 1st BATHROOM FROM EAST AT NORTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 29, 2026 |
| Sep 24, 2026 | B | Apt 10D · § 27-2005 HMC: REFIT REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 29, 2026 |
| Sep 24, 2026 | B | Apt 10D · § 27-2005 HMC: REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM EAST AT SOUTH IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 29, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | HPD B | § 27-2005 HMC: REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM WEST AT NORTH. IN THE 1st BATHROOM FROM EAST AT NORTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Sep 24, 2026 | HPD B | § 27-2005 HMC: REFIT REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Sep 24, 2026 | HPD B | § 27-2005 HMC: REFIT THE LOWER WINDOW SASH SO THAT IT WILL SLIDE WITHIN THE FRAME AND OPEN, AT THE FIRST WINDOW FROM EAST AT SOUTH IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 10D, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Sep 16, 2026 | DOB Safety | Facades: FISP Unsafe report filed | Closed |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 26, 2026 | ECB | Construction: SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO CRACKS IN THE TERRACOTTA AT EXPOSURE 4 OF STRUCTURE., REPAIR AND/REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 9:48 AM ET. BBL 1008947501.