Brooklyn · Block 4806 · Lot 1 · 11203

768 East New York Avenue

2 floors · 120,520 sq ft · built 1975 · class W1 · owner of record: Nyc Department Of Education

43open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
42dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 42 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4806). Agency page

Dec 31, 2026
in 42 days
Due this year
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 120,520 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7)
IssuedViolationHearingBalance
Jun 25, 2026Construction CLASS - 2
REISSUE ECB#35719716K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL AUDITORIUM,GYM BASEMENT CAFETERIA EME
#35734534P
Jul 20, 2026
POP/IN-VIO
$0
Jun 25, 2026Construction CLASS - 2
REISSUE ECB#35719715Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 2ND FL STAIR C,A 1ST FL AUDITORIUM,STAIR G,E,HALLWAY SMOKE DOORS NEAR RM'S 168,151,103,138,BASEMENT EXIT 4,1,7,STAIRS C,A,HAL
#35734535R
Jul 20, 2026
POP/IN-VIO
$0
May 12, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT(1ST FL) AUDITORIUM, GYM EMERGENCY LIGHTS NOT WORKING WHEN TEST
#35719716K
Jun 5, 2025
POP/IN-VIO
$0
May 12, 2025Construction CLASS - 2
REISSUE ECB #35677285P. EXIT DOOR NOT SELF CLOSING: NOTED: AT(1ST FL) AUDITORIUM EXIT 1, SMOKE DOOR NEAR ELEVATOR A BRNK(BASEMENT) STAIR A, C SMOKEDOOR NEAR RM B25A, B68 A AND L DOORS ARE INDISREPAIR/NOT CLOSIN
#35719715Z
Jun 5, 2025
POP/IN-VIO
$0
Jun 4, 2024Construction CLASS - 2
REISSUED ECB #35656400R. OBSERVED CORRIDOR AND STAIRWAY DOORS NOT WORKING PROPERLY. 2F STAIRWAY DOORS D, TWO AT A AND C-NWP. 1F CORRIDOR DOOR NEXT TO ROOM 168-NWP STAIRWAY DOORS B AND MAIN ENTRANCE DOOR-NWP BAS
#35677285P
Aug 21, 2024
POP/IN-VIO
$0
Jul 24, 2023Construction CLASS - 2
REISSUE #35657996N. NOTED: AT 2ND FLOOR CORRIDOR EXIT SIGN BY 251, EXIT SIGN AT STAIR G, AT ROOM 209, 1ST FLOOR EXIT SIGNS AT ROOM 109, EM AT THE AUDITORIUM, GYMNASIUM, AND BASEMENT STAIR G, THE EMERGENCY LIGHT
#35676401Z
Nov 3, 2023
POP/IN-VIO
$0
Jul 24, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 2ND FLOOR STAIR A, D, ROOM 227, 1ST FLOOR CORRIDOR BY 103, AUDITORIUM RIGHTMIDDLE, BASEMENT STAIR A, CORRIDOR BY STAIR G, BY B25, SMOKE BY EXIT 5
#35676400R
Nov 3, 2023
POP/IN-VIO
$0
DOB (8)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12343
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12342
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12344
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#07986
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#09636
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#09653
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#10752
DOB VIOLATION - ACTIVE
May 12, 1999CONSTRUCTION
HAZARDOUS
#309GN02
DOB VIOLATION - ACTIVE
DOB NOW Safety (28)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Sep 6, 2019Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 12:26 PM ET. BBL 3048060001.

Look up another building