Manhattan · Block 1321 · Lot 47 · 10017

767 3 Avenue

40 floors · 286,212 sq ft · built 1980 · class O4 · owner of record: 767 Third Property Owner Llc

6open violations
$6,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 286,212 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page

Feb 21, 2029
in 847 days
Filing window not open yet
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1321). Agency page

Dec 31, 2031
in 1890 days
Next due 2031
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-13 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7) · $6,250 owed
IssuedViolationHearingBalance
Apr 30, 2026Construction CLASS - 2
40 STORY ALT2 FACADE WORK ACTIVE SITE.OBSERVED C HOOKS IN PLACE/USE AT EXP#2 WITH 2 WIRE ROPES TIEBACKS TO ANGLED PLATES. UPON REQUEST TO RIGGER FOREMAN FOR MANUFACTURERS SPECIFICATIONS FOR ALL EQUIPMENT USED O
#39553708Z
Jul 9, 2026
IN VIOLATION
$1,250
Apr 30, 2026Construction CLASS - 1
40 STORY ALT2 WINDOW/MASONRY EXTERIOR FACADE WORK ACTIVE SITE.C HOOKS ON SUSPENDED SCAFFOLDS IN PLACE/USE EXP#2. CONTRARY, NO DETAILS FOR WIRE ROPES ATTACHED TO PARAPET BASE CONNECTION NOT ON I BEAM, PLANS SHOW
#39553707R
Jul 9, 2026
IN VIOLATION
$2,500
Mar 20, 2026Construction CLASS - 1
DURING INSPECTION OF 40 STORY BUILDING ALTERATION, OBSERVED ON EXP 3 MAKESHIFT FOOTINGS WERE BEING PREPARED FOR THE HOIST SUPPORT UPON REVIEW OF APPROVED DRAWINGS NO DESIGN DETAIL FOR THE FOOTINGS. CONTRARY TO
#39552082L
Jan 12, 2027
$2,500
Jun 17, 2024Construction CLASS - 2
A.C.27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE I
#37028887P
Sep 12, 2024
DEFAULT
$0
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
#37025353R
Jun 29, 2023
ADMIT/IN-VIO
$0
Nov 1, 2021Construction CLASS - 2
SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN
#37022488K
Mar 17, 2022
ADMIT/IN-VIO
$0
Mar 30, 2021Construction CLASS - 2
SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN HEIG
#37020869P
Jul 8, 2021
ADMIT/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00625
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 29, 2026ECBElevators: VF... HOIST MACHINE BRAKE MAINTENANCE TAG EXPIRED PROVIDE.. 8.6.4.6... MAINTENANCE LOG UPDATE MISSING PROVIDE...8.6.1.1.A..Closed
Jul 29, 2026ECBElevators: VF.. HOIST MACHINE BRAKE MAINTENANCE TAG EXPIRED PROVIDE... 8.6.4.6.... MAINTENANCE LOG UPDATE MISSING PROVIDE... 8.6.1.2.A...Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:09 AM ET. BBL 1013210047.

Look up another building