3 floors · 2 apartments · 4,152 sq ft · built 1931 · class S9 · owner of record: Li, Jian Qiu
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-29 (Accepted). Agency page | Dec 31, 2026 in 68 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 7, 2026 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI FOR COMPLAINT#3874108 .OBSERVED 100% OF WORK HAS BEEN COMPLETED WHEN ON A STOP WORK ORDER. ALL LIGHTING, PLUMBING ,WINDOWS AND TRIM AND PAINT #39199652J | May 20, 2027 PENDING | $10,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 17, 2021 | A | Apt 12 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE (LOOSE) UPPER SASH WINDOW, 2ND FROM LEFT, AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 12, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | ECB | Construction: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI FOR COMPLAINT#3874108 .OBSERVED 100% OF WORK HAS BEEN COMPLETED WHEN ON A STOP WORK ORDER. ALL LIGHTING, PLUMBING ,WINDOWS AND TRIM AND PAINT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:56 AM ET. BBL 3059520010.