6 floors · 56 apartments · 66,366 sq ft · built 1929 · class D1 · owner of record: Ludor Properties L P
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 66,366 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2099). Agency page | Dec 31, 2029 in 1166 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #35667706P ISSUED ON 12-21-2023 FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT-MANNER AND FOR FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY., FILE #39185387K | Feb 12, 2027 PENDING | $1,250 |
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39102073L ISSUED ON 12-21-2023 FOR FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY., FILE A CERTIFICATE OF CORRECTION #39185386Z | Feb 12, 2027 PENDING | $1,250 |
| Dec 21, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN UNOBSTRUCTED EXIT PASSAGEWAY. AS NOTED: AT TIME OFINSPECTION OBSERVED REAR, EGRESS PARTIALLY OBSTRUCTED WITH GARBAGE LEADING TO STREET. REMEDY: REMOVE OBSTRUCTION. #35667706P | Jul 24, 2025 IN VIOLATION | $0 |
| Dec 21, 2023 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO PROVIDE UNOBSTRUCTED PASSAGEWAY DUE EXCESSIVE AMOUNTS OF GARBAGE PARTIALLY BLOCKING THE REAR EXIT PASSAGEWAY TO STREET., REMOVE OBSTRUCTION #39102073L | Apr 18, 2024 IN VIOLATION | $0 |
| May 18, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#807058. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT #37011368M | May 9, 2019 IN VIOLATION | $0 |
| Jun 9, 2017 | Construction CLASS - 2 FAILURE TO PROVIDE SIDEWLAK SHED EXTENSION OVER ADJ BLDG.NOTE:AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED ON EXP#1W/O EXTENSION OVER ADJ PROPERTY SIDEWALK SHED SHALL EXTEND PAST PROPERTY LINE TO(750 RIVERSID #35258937P | Oct 5, 2017 WRITTEN OFF | $0 |
| Dec 7, 2011 | Construction CLASS - 2 SIDEWALK SHED DOES NOT MEET BUILDING CODE SPECIFICATIONIS. NOTED:AT TIME OF INSPECTION SIDEWALK SHED IS MISSING PARAPET WALL AT SOUTH AND EAST SIDE OF THE SHED. PICTURE DATED: 20111207-14.10 STOP ALL WORK ON #34897962L | Apr 19, 2012 WRITTEN OFF | $0 |
| Aug 12, 2011 | Unknown CLASS - 3 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER: NOTED: THE FOLLOWING CONDITIONS: NO EMERGENCY LIGHTS AT PUBLIC HALL & CELLAR AREA (NOTE IN THE EVENT OF A POWER FAILURE A NON LIGHT EXIT PASSAGEWAY WILL BE #34915639H | Sep 29, 2011 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 15, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00036 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| May 15, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 27, 2025 | B | Apt 3D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAT 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17645308 ISSUED 24-JAN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2 | Jul 1, 2025 |
| Dec 23, 2024 | C | Apt 2A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jan 16, 2025 |
| Dec 23, 2024 | C | Apt 2A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL | Jan 16, 2025 |
| Dec 23, 2024 | C | Apt 2A · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jan 16, 2025 |
| May 9, 2022 | C | Apt 3D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX.30. EAST APPROX.5.SQ.FT. AND SOUTH WALL APPROX.5.SQ.FT. IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 4, 2022 |
| Aug 11, 2021 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER POTS AT 5TH STORY BALCONY BUILDING FRONT ATWEST | Sep 15, 2021 |
| Feb 18, 2016 | B | Apt 3D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 24, 2016 |
| Apr 20, 2012 | A | Apt 5A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 24, 2012 |
| Apr 13, 2011 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2011 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 11:58 PM ET. BBL 1020990063.