class V1 · owner of record: Bais Ruchel Bedford Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 14, 2026 | Construction CLASS - 2 COMPLIANCE INSPECTION, GC SWEEP 623041: DURING MY INSPECTION, I OBSERVED THAT THE PERMITTED JOBSITE FENCE IN PLACE WAS NOT MAINTAINED. LOOSE SEPARATING PLYWOOD PANELS WERE DETERIORATED AND COVERED IN GRAFFITI. #39560531H | Dec 23, 2026 PENDING | $1,000 |
| Jan 7, 2015 | Construction CLASS - 1 PLACE OF ASSEMBLY CONTRARY TO APPROVED CONSTRUCTION DOCUMENTS TPA #206/14 INDICATING A MINIMAL OF 4 FIRE GUARDS,1 IN PLACE ONLY ALSO,INDICATING A MAXIMUM OF 407 PERSONS. NOTED: SEATING FOR OVER 500 PERSONS. AT #35073393P | Sep 18, 2015 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 OCCUPANCY CONTRARY TO DEPT RECORDS,EXISTING BLDG DEMOLISHED IN 1985, RECORDS INDICATE PROPERTY TO BE VACANT LOT, NOW NEW BLDG BEING USED AS FULLY OCCUPIED 1STORY BUILDING. RMDY: VACATE ENTIRE BUILDING. #35119259P | Sep 18, 2015 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 BC907.2 FAILURE TO PROVIDE REQUIRED FIRE ALARM SYSTEM, NOTED 1 STORY NEW BLDG FULLY OCCUPIED AS A SCHOOL WITH NO FDNY COMMAND STATION FIRE ALARM. RMDY:PROVIDE FIRE ALARM. #35119261Y | Aug 17, 2016 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 BC714.1 FAILURE TO PROVIDE REQUIRED FIRE RATING ON STRUCTGURAL MEMBER THROUGHOUT NEW BUILDING,ILLEGAL 1 STORY METAL BUILDING WITH EXPOSED UNTREATED STRUCTURAL MEMBERS. RMDY: PROVIDE FIRE RATING. #35119263H | Aug 17, 2016 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED SPRINKLER SYSTEM NOTED, 1 STORY NEW BLDG NO PERMITS FOR SPRINKLER SYSTEM OR RECORD OF ACTIVE SYSTEM,NO DESIGN DRAWINGS BY A LICENSED PROFESSIONAL INDICATING SUFFICIENT COVERAGE. DESI #35119262X | Aug 17, 2016 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 BC1001.3 FAILURE TO MAINTAIN EGRESS CLEAN AND UNOBSTRUCTED AT NEW BLDGBUILDING OCCUPIED AS PLACE OF ASSEMBLY WITH OVER 500 PERSONS SEATING NO MEANS OF EGRESS DUE TO EXIT DOORS PADLOCKED SHUT AND MAGNETIC DEVIC #35119264J | Apr 20, 2015 WRITTEN OFF | $0 |
| Dec 17, 2014 | Construction CLASS - 1 OPERATION OF A PLACE OF ASSEMBLY W/O A CURRENT CERTIFICATE OF OPERATION, NOTED 1 STORY BLDG ENTIRELY OCCUPIED AS A SCHOOL ASSEMBLY OF OVER 500 SEATING.INADEQUATE EGRESS,SPRINKLER,EMERGENCY LIGHTING,NO PERMIT FO #35119131X | Aug 17, 2016 WRITTEN OFF | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | ECB | Construction: COMPLIANCE INSPECTION, GC SWEEP 623041: DURING MY INSPECTION, I OBSERVED THAT THE PERMITTED JOBSITE FENCE IN PLACE WAS NOT MAINTAINED. LOOSE SEPARATING PLYWOOD PANELS WERE DETERIORATED AND COVERED IN GRAFFITI. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 12:42 PM ET. BBL 3017360010.