Brooklyn · Block 5352 · Lot 82 · 11218

76 Church Avenue

3 floors · 2 apartments · 4,971 sq ft · built 1930 · class S9 · owner of record: 80 Church Avenue, Llc.

48open violations
$34,375ECB/OATH penalties owed
1HPD class C (immediately hazardous)
46dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-05-27 (Accepted). Agency page

Dec 31, 2026
in 46 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 411 days
Next cycle year 2027

Open violations

ECB / OATH (9) · $34,375 owed
IssuedViolationHearingBalance
Sep 2, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; OBSERVED AT EXP 4 STEP CRACKS RUNNING FROM GRADE TO PARAPET. CRACKED/BROKEN AND LOOSE BRICKS CAUSING BULGING TOWARD NEIGHBORING PROPERTY 211 DAHILL RD. CON
#39158856K
Dec 2, 2026
DEFAULT
$25,000
Jun 23, 2023Construction CLASS - 1
NOTED, MASONRY WALL ON EXP. #4 OF GARAGE HAVE SEVERAL LARGE CRACKS, MISSING MORTAR AND STEP CRACKS. ALSO SITED NOV #35137528N AND #35148399J FOR THE SAME CONDITIONS.
#39518218M
Sep 6, 2023
DEFAULT
$6,250
Jul 19, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDINGS AND ALL PARTS THERE OF IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED THE CURB HAS BEEN LOWERED APPROX. 15 LF AT CORNER OF CHURCH AVE AND DAHILL RD. THE CURB HAS BEEN L
#39066235J
Aug 21, 2023
DEFAULT
$3,125
Oct 14, 2015Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTE: MASONRY WALL ONEXP#4 OF GARAGE HAS SEVERAL LARGE CRACKS,MISSING MORTAR & STEP CRACKS.ALSO NOTE: NOV 35137528N ISSUED 8/12/15 FOR SAME CONDITIONS.
#35148399J
Nov 30, 2015
WRITTEN OFF
$0
Aug 12, 2015Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.NOTED:THE WALL ON EXPOSURE 4 OF GARAGE IS CRACKED WITH MISSING MORTAR WITH STEP CRACKS AND BULGING. REMEDY: MAINTAIN BUIDLING WALL.
#35137528N
Sep 28, 2015
WRITTEN OFF
$0
Sep 3, 2009Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. NOTED: ROOF OF 1 STORY GARAGE @ 207 DAHILL RD (ADJACENT TO 3 STORY MD) NOW OCCUPIED A SEATING/REC. AREA AN ILLEGAL LARGE WORK DECK & LARGE WOOD CANOPY, OCCUPAN
#34807746P
Nov 24, 2010
IN VIOLATION
$0
Sep 3, 2009Unknown CLASS - 2
FAILURE TO COMPLY W/ COMM'S ORDER TO FILE A CERTIFICATE OF CORRECTION FOR IO#34611955R. REM: FILE CERTIFICATE OF CORRECTION.
#34807745N
Oct 26, 2009
DEFAULT
$0
Mar 19, 2009Unknown CLASS - 1
SEC. 28-201.1. FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO OBTAIN PERMIT TO CORRECT VIOLATION #34611955R FOR WORK W/O A PERMIT. ERECTED WOODEN STRUCTURE AT GARAGE ROOF W/O A PERMIT. REMEDY: COMPLY W/ORDER.
#34772497X
Jan 7, 2010
IN VIOLATION
$0
Feb 4, 2008Construction Non-Hazardous
WORK W/O PERMIT. NOTED: WOOD STRUCTURE DECK & STAIRS AT SOUTH SIDE FROM ROOF OF 1ST FLR GARAGE TO 3RD FLR APPROX. 20FTX12FTX15FT. WOOD STRUCTURE W.ROOF(NO WALLS)ON SOUTH SIDE OF GARAGE ROOF NO(WASS)/EACH APPROX
#34611955R
Mar 31, 2008
IN VIOLATION
$0
DOB (18)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12874
DOB VIOLATION - ACTIVE
Sep 2, 2025CONSTRUCTION
ENGINEERS REPORT REQUESTED DUE TO FACADE AT EXP 4 IN STATE OF DISREPAIR. FACADE SHOWING STEP CRACKS RUNNING FROM GRADE TO PARAPET. CRACKED/BROKEN AND LOOSE BRICKS CAUSING BULGING TOWARD NEIGHBORING PROPERTY 211 DAHILL RD.
#25-02058
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#11747
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#22326
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#24260
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#43918
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#08338
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#10457
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#08248
DOB VIOLATION - ACTIVE
Jan 13, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00216
DOB VIOLATION - ACTIVE
Nov 4, 2015FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00299
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#13716
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#14405
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#14631
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#14135
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#15137
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#16333
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#27299
DOB VIOLATION - ACTIVE
DOB NOW Safety (17)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Jan 13, 2016AEUHAZ FTC-AEU-HAZ
Active
Nov 4, 2015AEUHAZ FTC-AEU-HAZ
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Jan 1, 2009Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
HPD (4) · C 1 · B 3 · A 0
IssuedClassViolationCorrect by
Jul 8, 2008CSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING BOTTOM RAIL LOWER SASH 3RD STORY PUBLIC HALL WINDOW.Jul 14, 2008
Jul 8, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE PRESSURE CONTROL VALVES STEAM RADIATORS ALL ROOMS 3RD STORY.Aug 12, 2008
Jul 8, 2008BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF KEY ACTIVATED DOUBLE CYLINDER LOCKS ENTRANCE 3RD STORY APT.Aug 12, 2008
Jan 11, 2007BSECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE WEST SIDE OF BUILDING AT YARDFeb 20, 2007

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 1:14 AM ET. BBL 3053520082.

Look up another building