| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 26, 2026 | Construction CLASS - 2 I OBSERVED THE CONSTRUCTION FENCE @EXP#4 OPENED AND BLOWN DOWN ON NEIGHBORING PROPERTY AT EXP#4. THIS CREATES AN UNSAFE ACCESSIBLE CONDITION TO JOBSITE WHERE PUBLIC COULD ENTER SITE AND BE SEVERELY INJURED.MAIN #39559782Y | Dec 1, 2026 PENDING | $5,000 |
| Aug 4, 2025 | Unknown CLASS - 1 BC-3304.7_AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF 4 STORY NB,CURRENTLY AT FOUNDATION/EXCAVATION PHASE,OBSERVED THAT SAFE MEANS OF EGRESS AND INGRESS WAS NOT PROVIDED FROM FOUNDATION/EXCAVATION .THIS CONDI #39543201K | Mar 16, 2027 PENDING | $5,030 |
| Aug 4, 2025 | Unknown CLASS - 2 AT THE TIME OF INSPECTION AT THE ACTIVE JOB SITE OF A 4 STORY NB, I OBSERVED THE FOLLOWING CONDITIONS: MISSING TOOLBOX TALK LOG,CS DAILY LOG BOOK,PRE CONSTRUCTION SURVEY, MONITORING REPORT FOR ADJACENT BUILDING #39543217P | Mar 18, 2027 PENDING | $5,030 |
| Aug 4, 2025 | Construction CLASS - 1 DURING THE INSPECTION OF A FOUR-STORY NEW BUILDING AT AN ACTIVE JOB SITE, IT WAS OBSERVED THAT THE SOLDIER PILES WERE NOT INSTALLED ACCORDING TO THE APPROVED SOE (SUPPORT OF EXCAVATION) PLANS. THIS DEVIATION CR #39543199K | Mar 16, 2027 PENDING | $2,530 |
| Aug 4, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION OF THE FOUR-STORY NEW BUILDING CURRENTLY IN THE EXCAVATION PHASE, EARTHWORK WAS OBSERVED BEING DONE. FURTHER RESEARCH OF THE DEPARTMENT OF BUILDINGS (DOB) RECORDS SHOWED THAT NO NOTIFI #39543203Y | Mar 16, 2027 PENDING | $2,530 |
| Aug 4, 2025 | Construction CLASS - 2 DURING MY INSPECTION OF AN ACTIVE FOUR-STORY NEW BUILDING JOB SITE, CURRENTLY IN THE SOE PHASE, I REQUESTED THE CP ORLIN L. SUSAN, TO PROVIDE THE PRE-CONSTRUCTION SURVEY, MONITORING REPORT LOG, TOOLBOX TALK L #39543205H | Mar 16, 2027 PENDING | $1,280 |
| Aug 4, 2025 | Construction CLASS - 2 DURING MY INSPECTION AT AN ACTIVE JOB SITE OF A 4-STORY NEW BUILDING (NB), I OBSERVED THAT HOUSEKEEPING WAS INADEQUATE. MIXED MATERIALS AND DEBRIS WERE PRESENT, CREATING A TRIP AND FALL HAZARD FOR WORKERS AND P #39543206J | Mar 16, 2027 PENDING | $1,280 |
| Apr 29, 2025 | Construction CLASS - 2 DURING INSPECTION OF AN INACTIVE SITE, I OBSERVED THAT THE CONSTRUCTION FENCE WAS MISSING VIEWING PANELS WITH PLEXIGLASS. AS PER CODE VIEWING PANELS MUST BE INSTALLED AS PER CODE, TO SEE INSIDE THE SITE.INSTAL #39539650Y | Aug 26, 2025 IN VIOLATION | $1,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 26, 2026 | ECB | Construction: I OBSERVED THE CONSTRUCTION FENCE @EXP#4 OPENED AND BLOWN DOWN ON NEIGHBORING PROPERTY AT EXP#4. THIS CREATES AN UNSAFE ACCESSIBLE CONDITION TO JOBSITE WHERE PUBLIC COULD ENTER SITE AND BE SEVERELY INJURED.MAIN | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 10:48 AM ET. BBL 4022660098.