2 floors · 2 apartments · 2,920 sq ft · built 1930 · class K4 · owner of record: S A A K Imperio Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 57 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-04 (Accepted). Agency page | Dec 31, 2026 in 57 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 301 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 27, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39152663R, FILE A CERTIFICATE OF CORRECTION #39175083M | Nov 2, 2026 | $1,250 |
| Jul 2, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED A CLASS A APARTMENT AT CELLAR WITH NEW ELECTRICAL WORK DONE, UPON REVIEW DEPARTMENT OF RECORDS NO PERMITS WERE FOUND NOR FILED FOR ELECTRICAL WORK AT CELLAR., OBTAIN PERMIT #39152662P | Nov 18, 2025 DEFAULT | $6,250 |
| Jul 2, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION AT CELLAR OBSERVED THREE PIECE BATHROOM AND FULL KITCHEN, UPON REVIEW DEPARTMENT OF RECORDS NO PERMITS WERE FOUND NOR FILED FOR PLUMBING WORK AT CELLAR., OBTAIN PERMIT #39152664Z | Nov 18, 2025 DEFAULT | $6,250 |
| Jul 2, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION AT CELLAR OBSERVED FULL HEIGHT PARTITION WALLS ERECTED CREATING A 5-BEDROOM CLASS A APARTMENT. UPON REVIEW DEPARTMENT OF RECORDS NO PERMITS WERE FOUND FOR SUCH WORK., OBTAIN PERMIT #39152663R | Nov 18, 2025 DEFAULT | $6,250 |
| Jul 2, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED CLASS A APARTMENT IN CELLAR 5 BEDROOMS ALONG WITH A THREE PIECE BATHROOM AND FULL KITCHEN. THERE IS INADEQUATE LIGHT, INSUFFICIENT VENTILATION AND NO SECONDARY MEANS OF EGRESS. OC #39152661N | Nov 18, 2025 DEFAULT | $6,250 |
| Sep 27, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000077019N0001 IN ACCORDANCE WITH RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FOR LO #37029449J | Jun 3, 2025 DEFAULT | $1,562 |
| Sep 27, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000077019N0002 IN ACCORDANCE WITH RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FOR LO #37029450R | Jun 3, 2025 DEFAULT | $1,562 |
| Feb 29, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39014876P ISSUED ON 12/26/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR FAILURE TO MAINTAIN #35517362R | Feb 16, 2021 DEFAULT | $3,125 |
| Dec 26, 2019 | Construction CLASS - 1 OBSERVED REAR YARD, EXCESSIVE DEBRIS PRESENT SUCH AS WOOD, CMU BLOCK ,SHEETROCK, BRICKS ETC. POTENTIALLY CAUSING UNSAFE CONDITIONS. NOTED: ADDRESS CORRECTION., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING #39014876P | Feb 11, 2020 DEFAULT | $6,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
None open.