Bronx · Block 4035 · Lot 3 · 10462

756 Morris Park Avenue

3 floors · 2 apartments · 2,820 sq ft · built 1928 · class S2 · owner of record: Salvatore Desieno, Inc.

17open violations
$12,650ECB/OATH penalties owed
2HPD class C (immediately hazardous)
415dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027

Open violations

ECB / OATH (5) · $12,650 owed
IssuedViolationHearingBalance
Aug 3, 2026Construction CLASS - 1
OBSERVED AT REAR OF BUILDING ILLEGAL STRUCTURE THAT IS BEING USED A MANUFACTURING FACILITY FOR JEWELRY WITH SLEEPING QUARTERS., OBTAIN PERMIT
#39198803N
Oct 16, 2026
DEFAULT
$2,530
Aug 3, 2026Construction CLASS - 1
OBSERVED NO SECONDARY MEANS OF EGRESS FOR REAR STRUCTURE AT TIME OF INSPECTION., REPAIR AND/REPLACE
#39198802L
Oct 16, 2026
DEFAULT
$2,530
Jul 22, 2026Construction CLASS - 1
OBSERVED NEW ELECTRICAL OUTLETS 240 THREE PHASES FOR ELECTRIC KILN., OBTAIN PERMIT
#39197242H
Oct 2, 2026
DEFAULT
$2,530
Jul 22, 2026Construction CLASS - 1
OCCUPANCY IS CONTRARY TO C OF O OR DEPARTMENT RECORDS. HPC RECORD REAR TO BE A ONE-BEDROOM APARTMENT WITH KITCHEN. REAR CONVERTING MANUFACTURING FACILITY FOR JEWELRY WITH SLEEPING QUARTERS., DISCONTINUE ILLEGAL
#39197240Y
Oct 2, 2026
DEFAULT
$2,530
Jul 22, 2026Construction CLASS - 1
OBSERVED 2 PROPANE TANK NOT PROPERLY STORED OR MAINTAINED INSIDE REAR BUILDING, MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CODE
#39197241X
Oct 2, 2026
DEFAULT
$2,530
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (12) · C 2 · B 4 · A 5
IssuedClassViolationCorrect by
Aug 23, 2021I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Oct 12, 2021AApt 2NDFLO · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 15, 2022
Oct 12, 2021AApt 2NDFLO · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 15, 2022
Oct 12, 2021AApt 2NDFLO · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 15, 2022
Oct 12, 2021AApt 2NDFLO · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 15, 2022
Aug 31, 2021CApt 2NDFLO · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTHSep 24, 2021
Aug 23, 2021BApt 2NDFLO · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING CERAMIC WALL TILES AT NORTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 27, 2021
Aug 23, 2021CApt 2NDFLO · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTAug 19, 2021
Aug 23, 2021BApt 2NDFLO · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT TUB IN THE BATHROOM LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 27, 2021
Aug 23, 2021BApt 2NDFLO · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2NDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 27, 2021
Aug 19, 2021B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD FLOOR AT PUBLIC HALL, 2nd STORYSep 23, 2021
Aug 19, 2021A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORYNov 22, 2021

Issued in the last 120 days

DateSourceWhatNow
Aug 3, 2026ECBConstruction: OBSERVED AT REAR OF BUILDING ILLEGAL STRUCTURE THAT IS BEING USED A MANUFACTURING FACILITY FOR JEWELRY WITH SLEEPING QUARTERS., OBTAIN PERMITOpen
Aug 3, 2026ECBConstruction: OBSERVED NO SECONDARY MEANS OF EGRESS FOR REAR STRUCTURE AT TIME OF INSPECTION., REPAIR AND/REPLACEOpen
Jul 22, 2026ECBConstruction: OBSERVED NEW ELECTRICAL OUTLETS 240 THREE PHASES FOR ELECTRIC KILN., OBTAIN PERMITOpen
Jul 22, 2026ECBConstruction: OCCUPANCY IS CONTRARY TO C OF O OR DEPARTMENT RECORDS. HPC RECORD REAR TO BE A ONE-BEDROOM APARTMENT WITH KITCHEN. REAR CONVERTING MANUFACTURING FACILITY FOR JEWELRY WITH SLEEPING QUARTERS., DISCONTINUE ILLEGALOpen
Jul 22, 2026ECBConstruction: OBSERVED 2 PROPANE TANK NOT PROPERLY STORED OR MAINTAINED INSIDE REAR BUILDING, MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CODEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 12:38 PM ET. BBL 2040350003.

Look up another building