3 floors · 3 apartments · 3,760 sq ft · built 1901 · class S3 · owner of record: Atlantic King Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 2, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:NO FIRE STOPPINGPER BC712-3;27-345.NOTE:OBSERVED IN CELLAR A GAS METER ROOM.INADEQUATEFIRE STOPPING AT CEILING WITH MISSING SHEETROCK IN AREAS EXPOSING THE #35548149J | Apr 1, 2022 IN VIOLATION | $0 |
| Apr 2, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER-ILLUMINATION.FOREXITS,DISCHARGES AND PUBLIC CORRIDORS PER BC1006.1;27-381.NOTE OBSERVED AT ALL FLOORS.THE EMERGENCY EXIT LIGHTING WAS NOT WORKING WHEN TESTE #35555925Z | Apr 1, 2022 IN VIOLATION | $0 |
| Apr 2, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE THE BULKHEAD DOOR TO ROOF IS DETERIORATING AND SHOULD BE REPLACED WITH A FIRE PROOF SELF-CLOSING DOOR.ALSO AT ROOF LEVEL THE TEMPORARY GUARDRAIL/PARAPE #35555926K | Apr 1, 2022 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 5, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 8, 2026 |
| Apr 5, 2021 | C | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS AT ROOF BULKHEAD | May 1, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 8:17 AM ET. BBL 3039720053.