4 floors · 8 apartments · 11,500 sq ft · built 1910 · class C1 · owner of record: Uth 755 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-10-19 (Accepted). Agency page | Dec 31, 2026 in 70 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #2 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165192M | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #10 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD I #39165194X | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #9 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165193Y | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #8 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165209J | Jan 11, 2027 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #1 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165202R | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NOTE: AT CELLAR LEVEL 1ST FLOOR, APT C2 AND APTD2 ERECTED FULL HEIGHT PARTITIONS AND INSTALLED DOOR TO CREATE ROOMS FOR SLEEPING. ALSO INSTALLED WATER AND WASTE LINES FOR (2)ADDITIONAL TO #35667889R | Dec 4, 2026 DEFAULT | $2,530 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT CELLAR LEVEL. SRO #1 AT CELLAR LEVEL , WITH 6 BEDS AND HOUSEHOLD ITEMS., REST #39165195H | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #4 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165205M | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #6 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165207X | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #5 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165206Y | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #7 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165208H | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #C2. SRO #1 THE FRONT RIGHT ROOM OF THE APT, WITH 6 BEDS AND HOUSEH #39165199P | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #C2. SRO #2 THE MIDDLE RIGHT ROOM OF APT, WITH 6 BEDS AND HOUSEHOLD #39165200N | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #D2. SRO #2 THE MIDDLE RIGHT ROOM OF APT, WITH 6 BEDS AND HOUSEHOLD #39165197L | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #D2. SRO #3 THE 2ND MIDDLE ROOM TO THE RIGHT SIDE OF APT, WITH 6 BE #39165198N | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #C2. SRO #3 THE 2ND MIDDLE ROOM TO THE RIGHT SIDE OF APT, WITH 6 BE #39165201P | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM IN APARTMENT #D2. SRO #1 AT FRONT RIGHT ROOM OF APT WITH 6 BEDS AND HOUSEHOLD IT #39165196J | Dec 10, 2026 DEFAULT | $25,000 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT FIRST FLOOR LEVEL. SRO #3 AT FIRST FLOOR LEVEL , WITH 6 BEDS AND HOUSEHOLD IT #39165204K | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 28, 2025 | Quality of Life CLASS - 1 ILLEGAL OCCUPANCY WITH 3 OR MORE ADDITIONAL DWELLING UNITS. NOTED: AT THE TIME OF INSPECTION OBSERVED AN ILLEGALLY CONVERTED ROOM AT CELLAR LEVEL. SRO #2 AT CELLAR LEVEL , WITH 6 BEDS AND HOUSEHOLD ITEMS., REST #39165203Z | Dec 10, 2026 DEFAULT | $12,500 |
| Oct 3, 2025 | Construction CLASS - 2 WORK WITHOUT PERMIT. AT TIME OF INSPECTION IN BOILER ROOM I OBSERVED NEW HOT WATER HEATER, INSTALLED IN 2025. IN GAS METER ROOM OBSERVED DISCONNECTED GAS PIPING. NO PERMIT ON DOB RECORDS TO PERFORM THIS WORK., #39162491Z | Dec 8, 2026 DEFAULT | $6,250 |
| Mar 18, 2025 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY COFO AND/OR THE DEPARTMENT OF BUILDINGS RECORDS.PARTITION ERECTED CREATING 19 SRO ROOMS FOR LIVING AT 2,3,4 STORY APTS B1,B2,C2,D4 COMMUNITY BATHROOM AND KITCHEN PRESENT.NO #35485985J | Aug 24, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09276 | DOB VIOLATION - ACTIVE |
| Oct 30, 2025 | IMMEDIATE EMERGENCY SEAL ALL FIRE DAMAGED OPENINGS TO SAFEGUARD THE PUBLIC AND PROPERTY #19713 | DOB VIOLATION - ACTIVE |
| Oct 28, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED FIRE, WATER AND SMOKE DAMAGE AT APT# C1. OBSERVED AT 4TH FLOOR APARTMENT# D1, THE REAR WALL THAT THE FIRE ESCAPE IS ANCHORED TO IS COMPROMISED. THE REAR WALL HAS MISSING AND LOOSE BRICKS. FIRE RATING HAS BEEN REMOVED IN #25-02428 | DOB VIOLATION - ACTIVE |
| Oct 28, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DUE TO CHARRING OF STRUCTURAL MEMBERS AT APT C1. AT APT D1 THE FIRE ESCAPE IS COMPROMISED DUE TO DEFECTIVE MASONRY WALL WHICH ANCHORS THE FIRE ESCAPE COMPROMISING THE 2ND MEANS OF EGRESS. #25-02427 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #08316 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30699 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 5, 2025 | I | § 27-2089 ADM CODE THE PREMISES HAVE BEEN VACATED BY AN ORDER OF THIS DEPARTMENT AND CANNOT BE REOCCUPIED EXCEPT FOR CARETAKER, UNTIL (1) AN APPLICATION AND PLAN FOR THE WORK REQUIRED BY THIS ARTICLE HAVE BEEN FILED WITH AND APPROVED BY THE DEPARTMENT OF BUILDINGS, WHERE REQUIRED, (2) SUCH WORK HAS | — |
| Jul 31, 2026 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING 14TH METAL TREAD UP FROM BOTTOM AT 1ST STORY BALCONY AT BUILDING REAR AT FIRE ESCAPE | Aug 6, 2026 |
| Jul 31, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LATCH CAPABLE OF BEING PADLOCKED INSTALLED AT BULKHEAD DOOR LEADING TO ROOF , 4th STORY | Aug 6, 2026 |
| Jul 31, 2026 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS DROP LADDER FULLY EXTENDED AT BUILDING REAR AT NORTH AT FIRE ESCAPE | Aug 6, 2026 |
| Jul 31, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SKYLIGHT AT BULKHEAD , 4th STORY | Aug 6, 2026 |
| Feb 17, 2026 | B | Apt C1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT.AT CEILING IN THE BATHROOM LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18298936 ISSUED 15-OCT-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017. | Mar 24, 2026 |
| Nov 6, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BULKHEAD SKYLIGHT AT ROOF | Nov 12, 2025 |
| Nov 6, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR LEADING TO THE ROOF | Nov 20, 2025 |
| Nov 3, 2025 | C | Apt D1 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 9, 2025 |
| Nov 3, 2025 | C | Apt D2 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 9, 2025 |
| Nov 3, 2025 | C | Apt C2 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT C2, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 9, 2025 |
| Nov 3, 2025 | C | Apt B2 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT B2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 9, 2025 |
| Nov 3, 2025 | C | Apt C1 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 9, 2025 |
| Oct 17, 2025 | B | Apt D1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 21, 2025 |
| Oct 17, 2025 | C | Apt C1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2025 |
| Oct 17, 2025 | B | Apt C1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL REGLAZED BATHTUB IN THE BATHROOM LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 21, 2025 |
| Oct 17, 2025 | B | Apt D1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ,, IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 21, 2025 |
| Oct 17, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BROKEN MAILBOX APT # C1 AT PUBLIC HALL, 1st STORY | Nov 21, 2025 |
| Oct 17, 2025 | C | Apt C1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE BATHROOM LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2025 |
| Oct 17, 2025 | C | Apt C1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2025 |
| Oct 17, 2025 | C | Apt D1 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 23, 2025 |
| Oct 17, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAILBOX FOR APT # D1 AT PUBLIC HALL, 1st STORY | Nov 21, 2025 |
| Oct 16, 2025 | C | Apt 3W · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 3W, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 22, 2025 |
| Oct 16, 2025 | C | Apt D1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 22, 2025 |
| Oct 7, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Oct 13, 2025 |
| Oct 7, 2025 | C | Apt D1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES RANGE IN THE KITCHEN LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 13, 2025 |
| Oct 6, 2025 | C | Apt D1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 31, 2026 | HPD C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING 14TH METAL TREAD UP FROM BOTTOM AT 1ST STORY BALCONY AT BUILDING REAR AT FIRE ESCAPE | Open |
| Jul 31, 2026 | HPD C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LATCH CAPABLE OF BEING PADLOCKED INSTALLED AT BULKHEAD DOOR LEADING TO ROOF , 4th STORY | Open |
| Jul 31, 2026 | HPD C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS DROP LADDER FULLY EXTENDED AT BUILDING REAR AT NORTH AT FIRE ESCAPE | Open |
| Jul 31, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SKYLIGHT AT BULKHEAD , 4th STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 10:28 AM ET. BBL 3012640052.