2 floors · 2 apartments · 3,700 sq ft · built 1931 · class S2 · owner of record: Leso Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-09-02 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 3, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#35690881H AS OF 8/3/2026., FILE A CERTIFICATE O #39198801J | Oct 14, 2026 IN VIOLATION | $1,250 |
| Jun 2, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#35690881H ,NO PERMIT ON FILE AS OF 6/2/2026., COMPLY WITH COMMISSIONER'S ORDER #39191015K | Aug 12, 2026 IN VIOLATION | $2,500 |
| Jul 14, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMI.WORK NOTED AT 1ST AND CELLAR LEVEL HAS BEEN INSTALLED ELECTRICAL LINES FOR LIGHT,SWITCHES AND OUTLETS FOR CREATE 6 MASSAGE ROOMS,LAUNDRY AND BREAK ROOM WITH COOKING EQUIPMENT INSTALLED 220 #35690881H | May 4, 2026 IN VIOLATION | $2,500 |
| Jul 14, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT.WORK NOTED:AT CELLAR LEVEL INSTALLED WATER AND WASTE LINE FOR 3 PCS BATHROOM(TOILET,SINK AND SHOWER)AT 1ST FLOOR FOR 2PCS BATHROOM,WASH MACHINE,AND SCOPE SINK.REM:OBTAIN REQUIRED PERMIT. #35690880X | May 4, 2026 IN VIOLATION | $1,250 |
| Jul 14, 2025 | Construction CLASS - 1 OCCUPANCY CONRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED:1ST AND CELLAR LEVEL DUPLEX HAS BEEN CONVERTED/OCCUPIED AS MASSAGE PARLOR WITH 5 MASSAGE ROOMS WITH 8 MASSAGE BEDS AT C #35690877P | May 4, 2026 IN VIOLATION | $2,500 |
| Jul 14, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT.WORK NOTED AT 1ST AND CELLAR LEVEL HAS BEEN ERECTED PARTITION WALLS TO CREATE 5 MASSAGE ROOM AND BATHROOM AT CELLAR LEVEL AND 1 MASSAGE ROOM AND BATHROOM AT 1ST FLOOR.REM:OBTAIN REQUIRED P #35690879Z | May 4, 2026 IN VIOLATION | $1,250 |
| Jul 14, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF REQUIREDNUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366;BC 1021.1(2014 CODE) BC 1006.3(2022 CODE)FOR MASSAGE PARLOR AT CEL #35690878R | May 4, 2026 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #13583 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #12408 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #14795 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 3, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#35690881H AS OF 8/3/2026., FILE A CERTIFICATE O | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)