| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 1,132,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5141). Agency page | Dec 31, 2031 in 1870 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 28, 2026 | Construction CLASS - 2 RE-ISSUE #35720740Z. EXIT DOOR NOT SELF-CLOSING. NOTED: EXTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT ROOF-STAIRCASE "A". 1ST FLR-EXIT "6" AND EXIT "1". REMEDY: REPAIR/REPLACE DOOR. #35732509Y | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 RE-ISSUE #35720742M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: ON THE 3RD FLOOR RM #307 HAD KICK-STOP INSTALLED AT THE BOTT #35732515K | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDWATER LEAKING INTO A BUCKET AT THE TIME OF INSPECTION DUE TO WATER PENETRATIONS FROM CEILING IN RM #248B. REMEDY: REPAIR AND/OR REPLACE. #35732513R | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 RE-ISSUE #35683086N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT 2ND FLR-STAIRCASE "A", "B", "C" AND "D". 1ST FLR-SMOKE DOORS NEAR RM 12 #35732510L | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 28-301.1. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO, EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE; FC 1027.4. NOTED: ON ROOF LEVEL LANDING OBSERVED #35732511N | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 RE-ISSUE #35720743Y. EXIT DOOR NOT SELF-CLOSING. NOTED: OBSERVED EXTERIOR DOOR STAIRCASE "A" ON ROOF DOES NOT SELF-CLOSE PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35732514Z | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS GREATER THAN 20% PER FDNY 2008 CODE; FC 803.3.2. NOTED: IN THE LIBRARY ON 1ST FLR, THERE WAS ARTWORK HANGING FROM CEILING-PLANS, MOTORCYCLES, AND PEOPLE THROUGHOUT THE W #35732512P | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:INTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD FLR-SMOKE DOOR NEAR RM#340,STAIRCASE A.CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 3RD F #35732516M | May 29, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY EXIT SIGN#2-21 DID NOT WORK WHEN TESTED.EMERGENCY LIGHTS#1-3 #35732517Y | May 29, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 RE-ISSUE #35720741K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: EMERGENCY LIGHTS #1-2, 1-5, 1-7, 1-8, 1-9, 1 #35732508M | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 28-301.1. UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS GREATER THAN 20% PER FDNY 2008 CODE; FC 803.3.2. NOTED: ON 2ND FLR LOBBY, THERE IS FLAGS HANGING OFF OF THE CEILING THROUGHOUT THE WHOLE AREA. REMEDY: COMPLY W #35732506Z | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 RE-ISSUE #35720747L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-281. NOTED: EMERGENCY LIGHTS WERE NOT OPERATIONAL WHEN T #35732503N | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 RE-ISSUE #35720746J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: EMERGENCY LIGHTS WERE NOT OPERATIONAL IN VAR #35732501J | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 RE-ISSUE #35720749P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOORS AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: ON THE 3RD FLR CLASSROOM #S-330, 341, 342 HAVE KICK-STOPS I #35732504P | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 RE-ISSUE #35720763L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY WHENTESTED AT 3D FLR-STAIRCASE "B", SMOKE DOOR NEAR RM #317 AND RM #302. 2 #35732507K | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORFIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED, 7TH FLR-STAIRCASE "E" AND "F", SMOKE DOOR NEAR RM #729. 6TH FLR-STAIRCASE "B" AND " #35732505R | May 22, 2026 POP/IN-VIO | $0 |
| Apr 27, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORCLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT 2ND FLR RM #S-222A, 217, 279. 1ST FLR RM #S-161A, 165, 122A. REMEDY: REPAIR AND/OR #35732502L | May 22, 2026 POP/IN-VIO | $0 |
| Jul 9, 2025 | Construction CLASS - 2 REISSUE #35683095P DATE OF ISSUE: 08-06-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FL ROOMS 304, 305, 313, 325, 328, 329, 330, 336B, 337B, 3 #35720763L | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 2, 2025 | Construction CLASS - 2 REISSUE #35683083H DATE OF ISSUE: 08-02-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35720747L | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 2, 2025 | Construction CLASS - 2 REISSUE #35683082X DATE OF ISSUE: 08-02-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOORS AND/OR HARDWAREPER BC 1008.1; 27-371(J). AT THE TIME OF INSPECTION OBSERVED AND NOTED #35720749P | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 2, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL AT CAFETER #35720746J | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 REISSUE #35683086N DATE OF ISSUE: 08-02-2024. EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FLOOR STAIRWAY "A" 1 EXIT DOOR, 3RD FL. STAIRWAY " #35720740Z | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION OBSERVEDAND NOTED AT 3RD FLOOR STAIRWAY "B" 1 EXIT DOOR, 3RD FL STAIRWAY "A" 2EMERGENCY EXIT DOOR, 3RD FL(NEAR RM #358) 1 CORRIDOR EXIT DOOR, AT 2ND #35720743Y | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR OR "C" LEVLE AT GAS METER ROOM UNLAWFUL STORAGE IN ROOM BOXES, FURNITURE, STORAGE INSIDE GAS METE #35720744X | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 REISSUE #35673023R DATE OF ISSUE: 04-17-2023. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR PER BC 1008.1; 27-371(J) AT THE TIME OF INSPECTION OBSERVED AND NOTED VARIOUS L #35720742M | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 1, 2025 | Construction CLASS - 2 REISSUE #35683085L DATE OF ISSUE: 08-02-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35720741K | Aug 29, 2025 POP/IN-VIO | $0 |
| Aug 29, 2024 | Elevators CLASS - 2 RESTORE SERVICE TO DEVICE. #39123488X | Oct 11, 2024 POP/IN-VIO | $0 |
| Aug 6, 2024 | Construction CLASS - 2 REISSUE#35672408N EXIT DOOR NOT SELF-CLOSING.AT TIME OF INSPECTION I OBSERVED AT 3RD FLOOR LEVEL AT STAIRCASE B AND 2ND FLOOR CORRIDORS NEVER ROOM#237 AND 263 FLOOR STAIRCASE A AND OTHER VARIOUS LOCATION EXIT D #35683096R | Oct 18, 2024 POP/IN-VIO | $0 |
| Aug 6, 2024 | Construction CLASS - 2 REISSUE#35672409P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT CLASSROOM DOOR DEFECTIVE,INTERIOR CLASSROOM 304,313,329,330,337A,342,324,336,BOYS AND GIRLS BATHROO #35683095P | Oct 18, 2024 POP/IN-VIO | $0 |
| Aug 2, 2024 | Construction CLASS - 2 REISSUE#35672401K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION I OBSERVED AT VARIOUS LOCATION #35683085L | Oct 18, 2024 POP/IN-VIO | $0 |
| Aug 2, 2024 | Construction CLASS - 2 REISSUE#35672406J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED IN DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371.AT TIME OF MY INSPECTION I OBSERVED ILLEGAL HARDWARE INSTALLED ON FIREPRO #35683082X | Oct 18, 2024 POP/IN-VIO | $0 |
| Aug 2, 2024 | Construction CLASS - 2 REISSUE#35672403Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT TIME OF MY INSPECTION I OBSERVED EXISTING EXIT EMERGEN #35683083H | Oct 18, 2024 POP/IN-VIO | $0 |
| Aug 2, 2024 | Construction CLASS - 2 REISSUE#35672400Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF INSPECTION I OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE3 STORY SCHOOL BUILDING NUMEROUS INTERIOR DOORS THAT LEND TO EXIT ACCE #35683086N | Oct 18, 2024 POP/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6, 7C, AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORTREQUIRED BY 28-302.5 FOR CONTROL #808788. REMEDY: FILE ACCEPTABLE REPO #37026003L | Jan 26, 2024 POP/IN-VIO | $0 |
| Apr 18, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTE:OBSERVED ILLEGALHARDWARE INSTALLED ON FIREPROOF SELF-CLOSING DOORS LOCATED AT 7TH FLOO #35672406J | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 18, 2023 | Construction CLASS - 2 REISSUE#35655002Z-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTE:OBSERVED EXISTING EXIT/EMERGENCY LIGHT FIXTURES LOCATE #35672403Y | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 18, 2023 | Construction CLASS - 2 REISSUE#35553907X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:OBSERVED DEFECTIVE INTERIOR(CLASSROOM)DOORS LOCATED AT 3 FLOOR-ROOMS304,313,328,329,330,337A,342,325,339,338B,336B,BOYS & GIRLS BATHROOM A #35672409P | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 17, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTE:OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE 1ST & 2ND FLOOR EXISTING E #35672401K | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 17, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTE:OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE 3 STORY SCHOOL BUILDING,NUMEROUS CLASSROO #35673023R | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 17, 2023 | Construction CLASS - 2 REISSUE#35655045Z-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE 3 STORY SCHOOL BUILDING,NUMEROUS INTERIOR DOORS THAT LEAD TO EXIT ACCESS AND/OR EXIT DIS #35672400Z | Aug 18, 2023 POP/IN-VIO | $0 |
| Apr 11, 2022 | Construction CLASS - 2 REISSUED35555769X FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES&PUBLIC CORRIDORS PERBC1006.1;27-542 NOTE FOLLOWING EMERGENCY LIGHTS NOT WORKING,4FL EXITA& #35655002Z | Sep 16, 2022 POP/IN-VIO | $0 |
| Apr 7, 2021 | Construction CLASS - 2 REISSUE35423533P FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:DOORS THRUOUT ARENT CLOSING PROPERLY.COMPLY W/CODE. #35553907X | Jul 16, 2021 POP/IN-VIO | $0 |
| Apr 1, 2021 | Construction CLASS - 2 REISSUE35423265H FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:@GYM@BSMT EMERGENCY LIGHTS NOT WORKING.COMPLY W/CODE. #35555769X | Jul 16, 2021 POP/IN-VIO | $0 |
| Jun 2, 2020 | Construction CLASS - 2 REISSUE#35423533P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED OBSERVED CLASSROOM DOORS 3RD FLOOR 305,313,325,330,339,357,338B,337A ,336B,362,BOYS AND GIRLS BATHROOM ACROSS FROM 324 2ND FLOOR 207 #35498176M | Sep 4, 2020 POP/IN-VIO | $0 |
| Apr 30, 2020 | Construction CLASS - 2 REISSUE#35423265H FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.127-381. NOTED: EXISTING EMERGENCY LIGHTS AT 4TH FL ROOM 450 A & B,ALSO #35495290M | Aug 7, 2020 POP/IN-VIO | $0 |
| May 24, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE DOORS IN ROOMS 223,AND 221 ROTTEN ON HINGE SIDE UNABLE TO ATTACH HINGS AT TOP.ALSO AT ROOMS 204,206,205,239,235,237,AND 304,305,337,DOOR ARE RACKED AND #35423533P | Dec 20, 2019 POP/IN-VIO | $0 |
| May 21, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381. NOTE: AT BASEMENT GYM #5&4 & B&C EMERGENCY LIGHTS NOT LIGHTING. REMEDY: REPAIR & #35423265H | Oct 4, 2019 POP/IN-VIO | $0 |
| Nov 21, 2018 | Construction CLASS - 2 29R05)WORK WITHOUT A PERMIT, DOOR OPERATOR WAS INSTALLED WITHOUT PERMIT BEING OBTAINED AND APPLICATION BEING FILED. REM: FILE APPLICATION AND OBTAIN PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH NYCDOB. #38266543L | Mar 1, 2019 POP/IN-VIO | $0 |
| Nov 21, 2018 | Construction CLASS - 2 29R05)WORK WITHOUT A PERMIT, DOOR OPERATOR. WAS INSTALLED WITHOUT A PERMIT BEING OBTAINED AND APPLICATION BEING FILED. REM: FILED APPLICATION AND OBTAINED PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH NYCD #38266544N | Mar 1, 2019 POP/IN-VIO | $0 |
| Nov 18, 2016 | Construction CLASS - 2 WORK W/A PERMIT. NOTED AT 3RD,4TH,7TH FLRS, P/A AREAS CONVERTED TO CLASSROOMS. 3RD FLR DINING AR WITH FLOOR DINING AREA 7TH FLOOR LIBRARY PER C/O REMEDY OBTAIN PERMIT TO LEGALIZE.RMDY:COMPLY WITH CODE OBTAIN #35221171L | Jan 20, 2017 POP/IN-VIO | $0 |
| Nov 7, 2016 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT.REM:FILE ACCEPTABLE AMENDED REPORT #37001611Y | Jan 20, 2017 POP/IN-VIO | $0 |
| Aug 1, 2014 | Unknown CLASS - 2 REISSUE #34981615Z, WORK W/OUT PERMIT. @3RD,4TH,7TH FLRS, P/A AREAS CONVERTED TO CLASSROOMS. 3RD FLR DINING AREA, 4TH FLR DINING AREA, 7TH FLR LIBRARY PER C/O. REMEDY: OBTAIN PERMIT TO LEGALIZE. #35107356Z | Oct 31, 2014 POP/IN-VIO | $0 |
| Jun 6, 2012 | Unknown CLASS - 2 RE-ISSUED #34918335M. WORK W/O A PERMIT AT 3RD,4TH AND 7TH FLRS PUBLICASSEMBLY SPACE PARTITIONS ERECTED TO SUBDIVIDE SPACES INTO ADDITIONAL CLASSROOMS. REMEDY:OBTAIN A PERMIT OR RESTORE TO PRIOR LEGAL CONDITION #34981615Z | Aug 17, 2012 POP/IN-VIO | $0 |
| Jun 10, 2011 | Unknown CLASS - 2 REISSUE: 34861683Y WORK W/O A PERMIT. NOTED: LIBRARIES ON THE 3RD,4TH & 7TH FLOORS HAS BEEN ILLEGALLY CONVERTED INTO CLASSROOM BY ERECTED FULL HEIGHT PARTITION WALLS W/O ANY PERMITS. REMEDY: OBTAIN PERMIT OR #34918335M | Aug 5, 2011 POP/IN-VIO | $0 |
| Oct 12, 2010 | Unknown CLASS - 2 100#05. 100#05-JACK IN FOR HYDROLIC ELEVATOR INSTALLED WITHOUT PERMIT. #38212937K | Dec 17, 2010 PENDING | $0 |
| Oct 12, 2010 | Construction CLASS - 2 100-#-05/100-#-05-JACK FOR HYDROLIC ELEVATOR INSTALLED W/O PERMIT #38212938M | Jan 21, 2011 WRITTEN OFF | $0 |
| Jun 17, 2010 | Unknown CLASS - 2 REISSUE 34761915X WORK W/O PERMIT OBSERVED PLACE OF ASSEMBLY ROOMS CONVERTED INTO CLASSROOMS W/ FULL HEIGHT PARTITIONS LOCATED ON FLS 3 4 7 NO RECORD OF CORRECTION REM: OBTAIN PERMIT #34861683Y | Sep 17, 2010 WRITTEN OFF | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT. REMEDY: FILE ARCHITEC/ENGINEER REPORT. #36012531L | Aug 6, 2010 WRITTEN OFF | $0 |
| Dec 4, 2009 | Construction CLASS - 2 FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT REMEDY:FILE AN AMENDED REPORT FOLLOWING REPAIRS OF TH #36010899K | Feb 5, 2010 WRITTEN OFF | $0 |
| May 28, 2009 | Construction CLASS - 2 FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT.REMEDY:FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPA #36009623L | Jul 24, 2009 WRITTEN OFF | $0 |
Showing 60 of 65. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00631 | DOB VIOLATION - ACTIVE |
| Sep 23, 2020 | ELEVATOR #9027/688465 | DOB VIOLATION - ACTIVE |
| Oct 31, 2019 | ELEVATOR #9027/663717 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST #00069 | DOB VIOLATION - ACTIVE |
| Jul 23, 2018 | FACADE SAFETY PROGRAM #HAZ87527 | DOB VIOLATION - ACTIVE |
| Oct 7, 2013 | ELEVATOR #9027/491434 | DOB VIOLATION - ACTIVE |
| May 1, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74167 | DOB VIOLATION - ACTIVE |
| Jun 25, 2007 | LOCAL LAW 11/98 - FACADE #HAZ1637 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-NJ Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Sep 6, 2019 | Elevators ACJ1 | Active |
| Jul 23, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| May 1, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Jun 25, 2007 | Facades L1198 CYCLE 6 UNSAFE REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |