Brooklyn · Block 226 · Lot 29 · 11201

75 Pineapple Street

5 floors · 20 apartments · 7,322 sq ft · built 1899 · class C1 · owner of record: 75 Pineapple St, Llc

4open violations
$5,625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $5,625 owed
IssuedViolationHearingBalance
Jan 29, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39074196X ISSUED ON 11/18/2022, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT
#37032749Z
Apr 16, 2025
IN VIOLATION
$1,250
Jan 29, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39074208Y ISSUED ON 11/18/2022, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT
#37032750X
Apr 16, 2025
IN VIOLATION
$1,250
Aug 2, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKS TO THE DECORATIVE STONE OVER THE BUILDING ENTRANCE, AND CRACKS TO THE STONE LINTEL & SILL OF THE 1ST FLOOR WINDOW
#35646999P
Oct 11, 2023
DEFAULT
$3,125
Nov 18, 2022Construction CLASS - 2
OBSERVED AT THE TIME OF INSPECTION PLUMBING ELECTRICAL AND CONSTRUCTION WORK WITHOUT A PERMIT IN THE BASEMENT. FOR THE INSTALLATION OF FULL HEIGHT PARTITION WALLS AND PLUMBING PIPING AND ELECTRICAL TO CREATE A
#39074196X
Jan 25, 2023
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
May 21, 2025B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Jun 25, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 21, 2026, 10:16 PM ET. BBL 3002260029.

Look up another building