Brooklyn · Block 265 · Lot 1 · 11201

75 Livingston Street

32 floors · 105 apartments · 180,000 sq ft · built 1928 · class D4 · owner of record: Heights 75 Ownrs Corp

22open violations
$2,500ECB/OATH penalties owed
1HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 180,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 265). Agency page

Dec 31, 2035
in 3337 days
Next due 2035
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-11 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $18,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2025-08-28)

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
Nov 6, 2026Construction CLASS - 1
OBSERVED ON THE 27TH FLOOR, IN APT 27A, GAS PIPE NOT BEING CORRECTLY SUPPORTED. AS PER PC 308.4, STRUCTURAL ATTACHMENT. HANGERS AND ANCHORS SHALL BE ATTACHED TO THE BUILDING CONSTRUCTION IN AN APPROVED MANNER.,
#39210949P
Jan 20, 2027
PENDING
$2,500
Nov 9, 2020Elevators CLASS - 2
REPAIR AND RESTORE TO SERVICE.
#39031748P
Apr 14, 2021
IN VIOLATION
$0
DOB (6)
IssuedViolationStatus
Dec 30, 2025CONSTRUCTION
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01115313-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE
#25-03366
DOB VIOLATION - ACTIVE
Dec 4, 2021FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
#00179
DOB VIOLATION - ACTIVE
Nov 30, 2020HAZARDOUS CONDITION (FACADE)
CYCLE 9A UNSAFE REPORT FILED
#909202
DOB VIOLATION - ACTIVE
Jun 17, 2020ELEVATOR

#9027/683125
DOB VIOLATION - ACTIVE
Jun 26, 2018ELEVATOR

#9027/630732
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28628
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Dec 4, 2021Facades FISPFCS
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
Active
Nov 30, 2020Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
HPD (11) · C 1 · B 4 · A 6
IssuedClassViolationCorrect by
Mar 6, 2023CApt 14D · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 09; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 14D, 14th STORY, 2nd Apr 1, 2023
Mar 6, 2023A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR [ MISSING FRAME ] AT PUBLIC HALL, 1st STORYJun 9, 2023
Mar 6, 2023A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYJun 9, 2023
Mar 6, 2023A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Jun 9, 2023
Mar 6, 2023A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX [ MISSING NOTICE ] AT PUBLIC HALL, 1st STORYJun 9, 2023
Mar 6, 2023A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJun 9, 2023
Mar 6, 2023A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORYJun 9, 2023
May 22, 2008BApt 6A · D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE 6 STY NORTH APT 6A. LOCATED AT APT 6AJun 26, 2008
May 22, 2008BD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER CEILING EAST BASEMENT STY PUBLIC HALL.Jun 26, 2008
May 22, 2008BD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER CEILING BOILER ROOM CELLAR THRU OUT.Jun 26, 2008
May 22, 2008BApt 7D · D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO 7 STY SOUTHEAST APT 7D. LOCATED AT APT 7DJun 26, 2008

Issued in the last 120 days

DateSourceWhatNow
Nov 6, 2026ECBConstruction: OBSERVED ON THE 27TH FLOOR, IN APT 27A, GAS PIPE NOT BEING CORRECTLY SUPPORTED. AS PER PC 308.4, STRUCTURAL ATTACHMENT. HANGERS AND ANCHORS SHALL BE ATTACHED TO THE BUILDING CONSTRUCTION IN AN APPROVED MANNER.,Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 3:16 AM ET. BBL 3002650001.

Look up another building