Staten Island · Block 2380 · Lot 7501 · 10314

75 Country Drive South

2 floors · 52 apartments · 100,856 sq ft · built 1986 · class R3 · owner of record: Town And Country Condo Iii

165open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 42 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 58 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 100,856 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1138 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2380). Agency page

Dec 31, 2030
in 1503 days
Next due 2030

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
May 3, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03360
DOB VIOLATION - ACTIVE
Jan 1, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03022
DOB VIOLATION - ACTIVE
DOB NOW Safety (158)
IssuedViolationStatus
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active

Showing 60 of 158. Full list on the agency site.

HPD (5) · C 0 · B 4 · A 1
IssuedClassViolationCorrect by
Oct 30, 2024B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST AND 2ND CONCRETE THREAD FROM BOTTOM AT FRONT STOOP BUILDING ENTRANCE. AT STOOPDec 4, 2024
Aug 13, 2019AApt UNIT9 · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOOD BASE MOULDING AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT UNIT9 MID LEVEL, 1st STORY, SECTION ''81''Nov 16, 2019
Aug 13, 2019BApt UNIT9 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT UNIT9, 1st STORY, SECTION ''81''Sep 17, 2019
Aug 13, 2019BApt UNIT9 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT UNIT9, 1st STORY, SECTION ''81''Sep 17, 2019
Aug 13, 2019BApt UNIT9 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT UNIT9, 1st STORY, SECTION ''81''Sep 17, 2019

Issued in the last 120 days

DateSourceWhatNow
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 6:26 AM ET. BBL 5023807501.

Look up another building