3 floors · 2 apartments · 2,580 sq ft · built 1945 · class S2 · owner of record: Burgos, Emiro L
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 9, 2026 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 16, 2026 |
| Feb 9, 2026 | B | Apt 3RDFLO · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 16, 2026 |
| Feb 9, 2026 | B | Apt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 16, 2026 |
| Feb 9, 2026 | B | Apt 3RDFLO · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 16, 2026 |
| Feb 9, 2026 | C | Apt 3RDFLO · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 8, 2026 |
| Jul 22, 2024 | C | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATE 28 SQ.FT MOLD AT CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16504915 ISSUED 07-DEC-23 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE §2 | Aug 17, 2024 |
| Jun 20, 2024 | B | Apt FL3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16682643 ISSUED 19-FEB-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE COD | Jul 25, 2024 |
| Mar 21, 2024 | B | Apt 3RD · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RD, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 25, 2024 |
| Mar 21, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATOR LOCK, AT BUILDING ENTRANCE SECURITY DOOR. AT FRONT AREAWAY | Apr 25, 2024 |
| Feb 20, 2024 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT STORM DOOR , 1st STORY | Feb 26, 2024 |
| Feb 20, 2024 | C | Apt FL3 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 20, 2024 |
| Feb 20, 2024 | C | Apt FL3 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 20, 2024 |
| Feb 20, 2024 | A | Apt FL3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM IN THE KITCHEN LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 25, 2024 |
| Feb 20, 2024 | B | Apt FL3 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 26, 2024 |
| Feb 20, 2024 | B | Apt FL3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT FL3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 26, 2024 |
| Dec 26, 2023 | B | Apt 3 FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 3 FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16188980 ISSUED 27-AUG-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CO | Jan 30, 2024 |
| Dec 8, 2023 | C | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2023 |
| Dec 8, 2023 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2024 |
| Dec 8, 2023 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2024 |
| Dec 8, 2023 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2024 |
| Dec 8, 2023 | A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BULKHEAD , 3rd STORY | Mar 12, 2024 |
| Dec 8, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BULKHEAD , 3rd STORY | Jan 12, 2024 |
| Dec 8, 2023 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2024 |
| Dec 8, 2023 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2024 |
| Dec 8, 2023 | C | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2023 |
| Dec 8, 2023 | C | Apt 3 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE KITCHEN LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 8, 2023 |
| Sep 1, 2023 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT STORM DOOR AT PUBLIC HALL, 1st STORY | Sep 7, 2023 |
| Aug 28, 2023 | B | Apt 3 FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3 FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 2, 2023 |
| Aug 28, 2023 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC FIXTURES AT CEILING AT PUBLIC HALL, 1st STORY | Oct 2, 2023 |
| Aug 28, 2023 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL AT PUBLIC HALL, 1st STORY | Oct 2, 2023 |
| Aug 28, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORY | Oct 2, 2023 |
| Aug 28, 2023 | A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORY | Dec 1, 2023 |
| Aug 28, 2023 | B | Apt 3 FL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3 FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 2, 2023 |
| Aug 28, 2023 | B | Apt 3 FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3 FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 2, 2023 |
| Aug 28, 2023 | B | Apt 3 FL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3 FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 2, 2023 |
| Aug 14, 2023 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT BUILDING FRONT ENTRANCE METAL DOOR | Aug 20, 2023 |
| Mar 20, 2023 | A | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 23, 2023 |
| Mar 20, 2023 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT BUILDING FRONT ENTRANCE METAL DOOR. | Mar 26, 2023 |
| Mar 20, 2023 | B | Apt 1 · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BASIN IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 24, 2023 |
| Jun 3, 2022 | B | § 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 60 WATTS AT AT PUBLIC HALL STAIRS, 2nd STORY | Jul 8, 2022 |
| May 31, 2022 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL ,EAST WALL AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 5, 2022 |
| May 31, 2022 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 5, 2022 |
| May 31, 2022 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 5, 2022 |
| May 31, 2022 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL,WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 5, 2022 |
| Jan 24, 2012 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF DOUBLE CYLINDER LOCK AT METAL DOOR AT PUBLIC HALL, 1st STORY | Jan 30, 2012 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:22 AM ET. BBL 4014950067.