3 floors · 2 apartments · 2,587 sq ft · built 1960 · class B1 · owner of record: Salvador, Jr, Roosevelt
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Required only if the owner doesn't live there |
None open.
| Issued | Violation | Status |
|---|---|---|
| May 16, 2009 | CONSTRUCTION TECHNICAL REPORT OF RESPONSIBILITY (TR-1) ON FILE IS NOT FILLED IN AS REQUIRED PRIOR TO PERMIT ISSUANCE AND START OF WORK UNDER CONTROLLED INSPECTION FOR UNDERPINNING AND STRUCTURAL STABILITY AND TENANT SAFETY UNDERPINNING HAS BEEN COMPLETED AT EXTERIOR WALLS IN LOWERED CELLAR REMEDY: SUBMIT REPORT #EX01ADS | DOB VIOLATION - ACTIVE |
| Apr 16, 2008 | CONSTRUCTION WORK CONTRARY TO APPROVED PLANS 310082317 ALT UNDERPINNING PROCESSES CONTRARY IN THAT NO CONCRETE USED AS UNDERPINNING 6 INCH NON LOAD BEAR ING BLOCK CM USED NO DRYPACK AT EXISTING FOOTING TO CMU REAR AREA DROP DOWN TO PROPOSED ELEVATION 7' 4" CONTRARY TO PLAN PLAN MISSING PIT AT WEST AT WINDOW REME #EX1801DP | DOB VIOLATION - ACTIVE |
| Nov 1, 2007 | CONSTRUCTION STOP ALL WORK/BACKFILL TO EXISTING GRADE,OBTAIN A PERMIT IF FEASIBLE/P ROVIDE ENGINEER REPORT,CALL FOR INSPECTION BEFORE RESUMING WORK #1801RM | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:03 AM ET. BBL 3080020017.