Manhattan · Block 1002 · Lot 1 · 10019

745 7 Avenue

32 floors · 1,020,000 sq ft · built 1999 · class O4 · owner of record: Us Real Estate Holdings No.1 Limited

9open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
185dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,020,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $4,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 847 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1002). Agency page

Dec 31, 2032
in 2256 days
Next due 2032

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Sep 28, 2026Construction CLASS - 2
32 STORY COMMERCIAL BUILDING ACTIVE SITE, INSTALLATION ON PERSONNEL HOIST AT EXP#3 IN PROGRESS/NOT COMPLETED. OBSERVED NO OVERHEAD PROTECTION/SHED IN PLACE WITHIN 20 FT OF HOIST.UNFINISHED WORK ABOVE, WORKER'S
#39559877R
Dec 3, 2026
PENDING
$5,000
DOB (8)
IssuedViolationStatus
May 2, 2013ELEVATOR

#9028/444861
DOB VIOLATION - ACTIVE
May 2, 2013ELEVATOR

#9028/444863
DOB VIOLATION - ACTIVE
May 2, 2013ELEVATOR

#9028/444862
DOB VIOLATION - ACTIVE
Mar 27, 2008ELEVATOR

#9011/246187
DOB VIOLATION - ACTIVE
Nov 5, 2007ELEVATOR

#9444/223494
DOB VIOLATION - ACTIVE
Nov 5, 2007ELEVATOR

#9444/223493
DOB VIOLATION - ACTIVE
Oct 23, 2002ELEVATOR

#1F10108
DOB VIOLATION - ACTIVE
Oct 23, 2002ELEVATOR

#1P41614
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 28, 2026ECBConstruction: 32 STORY COMMERCIAL BUILDING ACTIVE SITE, INSTALLATION ON PERSONNEL HOIST AT EXP#3 IN PROGRESS/NOT COMPLETED. OBSERVED NO OVERHEAD PROTECTION/SHED IN PLACE WITHIN 20 FT OF HOIST.UNFINISHED WORK ABOVE, WORKER'SOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:35 AM ET. BBL 1010020001.

Look up another building