Brooklyn · Block 4313 · Lot 76 · 11208

743 Cleveland Street

3 floors · 9 apartments · 9,281 sq ft · built 1923 · class C1 · owner of record: Mhany 2015 Housing Development Fund Corp

33open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-02 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#12762
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#33635
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#35376
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (28) · C 6 · B 13 · A 9
IssuedClassViolationCorrect by
Aug 5, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF ELECTROMAGNECTIC LOCKING ASSEMBLY AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYAug 11, 2026
Aug 5, 2026C§ 27-2005 ADM CODE PROVIDE HEAVY DUTY LOCKING ASSEMBLY DEVICE AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYAug 11, 2026
Aug 5, 2026B§ 27-2005 HMC: REFIT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYSep 9, 2026
Jul 31, 2026BApt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18750687 ISSUED 31-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.Sep 4, 2026
Jul 31, 2026BApt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT WINDOW SEAL AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18750686 ISSUED 31-MAR-26 HAS BEEN UPGRADED TO CLASS B PERSep 4, 2026
Jul 7, 2026BApt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18691864 ISSUED 08-MAR-26 HAS BEEN UPGRADED TO CLASS B PER AAug 11, 2026
Jul 7, 2026BApt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18691872 ISSUED 08-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISAug 11, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT 3 STORY CEILING AT PUBLIC HALL, 3rd STORYApr 13, 2026
Mar 9, 2026CApt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2026
Mar 9, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORYJun 12, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH AND SOUTH WALLS IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026CApt 3A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 4, 2026
Mar 9, 2026BApt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026BApt 3A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3A UPPER LEVEL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 12, 2026
Mar 9, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOMMar 15, 2026
Mar 9, 2026BApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2026
Mar 6, 2026CApt 1B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 6, 2026

Issued in the last 120 days

DateSourceWhatNow
Aug 5, 2026HPD C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF ELECTROMAGNECTIC LOCKING ASSEMBLY AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYOpen
Aug 5, 2026HPD C§ 27-2005 ADM CODE PROVIDE HEAVY DUTY LOCKING ASSEMBLY DEVICE AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYOpen
Aug 5, 2026HPD B§ 27-2005 HMC: REFIT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYOpen
Jul 31, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18750687 ISSUED 31-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.Open
Jul 31, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT WINDOW SEAL AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18750686 ISSUED 31-MAR-26 HAS BEEN UPGRADED TO CLASS B PEROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 9:43 PM ET. BBL 3043130076.

Look up another building