Brooklyn · Block 5927 · Lot 31 · 11209

7410 Ridge Boulevard

6 floors · 82 apartments · 87,532 sq ft · built 1930 · class D1 · owner of record: Hf Bay Ridge L.P.

61open violations
$0ECB/OATH penalties owed
15HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-15 (Accepted). Agency page

Dec 31, 2026
in 69 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 87,532 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5927). Agency page

Dec 31, 2027
in 434 days
Next due 2027
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 800 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Jun 3, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00243
DOB VIOLATION - ACTIVE
Jun 28, 2001CONSTRUCTION
WORK WITHOUT A PERMIT WORK NOTED: AT REAR AREA WAY OF BUILDING TWO OPENING GATES 10' CURB CUT NOTED NO PARKING NOTED RED FORD TARYS PARKING AS WELL AT TIME OF INSPECTION ARE USED FOR PARKING DRIVEWAY REMEDY: OBTAIN PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL USE
#10A03
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#22790
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Jun 3, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (56) · C 15 · B 33 · A 8
IssuedClassViolationCorrect by
Jul 15, 2025AApt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WESTOct 18, 2025
Jul 15, 2025AApt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WESTOct 18, 2025
Jul 15, 2025AApt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WESTOct 18, 2025
Jun 9, 2025CApt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTJul 5, 2025
Jun 9, 2025BApt 6H · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTJul 14, 2025
Jun 9, 2025BApt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTJul 14, 2025
Jun 9, 2025BApt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTJul 14, 2025
Jun 9, 2025BApt 6H · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WESTJul 14, 2025
May 23, 2025BApt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW 2ND WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 27, 2025
May 23, 2025BApt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 27, 2025
May 23, 2025BApt 4K · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 27, 2025
May 23, 2025BApt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DROWER AT SOUTH IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 27, 2025
Apr 17, 2025BApt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALLS IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''May 22, 2025
Apr 17, 2025BApt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''May 22, 2025
Apr 17, 2025BApt 6G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''May 22, 2025
Apr 17, 2025CApt 6H · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AMay 11, 2025
Apr 17, 2025BApt 6G · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE KNOB AT DOOR PREVENTING ENTRANCE TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''May 22, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 2nMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 2nd DOOR FRAMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAMEMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 6HMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NORMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1stMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1stMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1stMay 10, 2025
Apr 16, 2025AApt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2025
Apr 16, 2025AApt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2025
Apr 16, 2025CApt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 12, 2025
Apr 16, 2025CApt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 12, 2025
Apr 16, 2025AApt 6H · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2025
Apr 16, 2025BApt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 21, 2025
Apr 16, 2025BApt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE FOYER LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 21, 2025
Apr 16, 2025BApt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 21, 2025
Apr 16, 2025AApt 6H · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 20, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2May 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1stMay 10, 2025
Apr 16, 2025CApt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 4th ROOM FROM EAST LOCATED AT APTMay 10, 2025
Apr 14, 2025AApt 5P · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Jul 18, 2025
Apr 10, 2025BApt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING & EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING & EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING & NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CLOSET CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 10, 2025BApt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 15, 2025
Apr 9, 2025BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 14, 2025
Apr 9, 2025BApt 5P · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''May 14, 2025
Mar 13, 2025BApt 6P · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Apr 17, 2025
Mar 13, 2025BApt 6P · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Apr 17, 2025
Mar 13, 2025BApt 6P · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Apr 17, 2025
Dec 26, 2023BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Jan 30, 2024
Dec 26, 2023BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Jan 30, 2024
Oct 12, 2022BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 16, 2022
Oct 12, 2022BApt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 16, 2022

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 10:50 PM ET. BBL 3059270031.

Look up another building