6 floors · 82 apartments · 87,532 sq ft · built 1930 · class D1 · owner of record: Hf Bay Ridge L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-15 (Accepted). Agency page | Dec 31, 2026 in 69 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 87,532 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5927). Agency page | Dec 31, 2027 in 434 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 3, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00243 | DOB VIOLATION - ACTIVE |
| Jun 28, 2001 | CONSTRUCTION WORK WITHOUT A PERMIT WORK NOTED: AT REAR AREA WAY OF BUILDING TWO OPENING GATES 10' CURB CUT NOTED NO PARKING NOTED RED FORD TARYS PARKING AS WELL AT TIME OF INSPECTION ARE USED FOR PARKING DRIVEWAY REMEDY: OBTAIN PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL USE #10A03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #22790 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Jun 3, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 15, 2025 | A | Apt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Oct 18, 2025 |
| Jul 15, 2025 | A | Apt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Oct 18, 2025 |
| Jul 15, 2025 | A | Apt 6H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Oct 18, 2025 |
| Jun 9, 2025 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Jul 5, 2025 |
| Jun 9, 2025 | B | Apt 6H · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Jul 14, 2025 |
| Jun 9, 2025 | B | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Jul 14, 2025 |
| Jun 9, 2025 | B | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Jul 14, 2025 |
| Jun 9, 2025 | B | Apt 6H · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Jul 14, 2025 |
| May 23, 2025 | B | Apt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW 2ND WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4K · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 27, 2025 |
| May 23, 2025 | B | Apt 4K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DROWER AT SOUTH IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 27, 2025 |
| Apr 17, 2025 | B | Apt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALLS IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 22, 2025 |
| Apr 17, 2025 | B | Apt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 22, 2025 |
| Apr 17, 2025 | B | Apt 6G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 22, 2025 |
| Apr 17, 2025 | C | Apt 6H · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | May 11, 2025 |
| Apr 17, 2025 | B | Apt 6G · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE KNOB AT DOOR PREVENTING ENTRANCE TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 22, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 2n | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 2nd DOOR FRA | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 6H | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NOR | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | May 10, 2025 |
| Apr 16, 2025 | A | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 20, 2025 |
| Apr 16, 2025 | A | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 20, 2025 |
| Apr 16, 2025 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 12, 2025 |
| Apr 16, 2025 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 12, 2025 |
| Apr 16, 2025 | A | Apt 6H · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 20, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 21, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE FOYER LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 21, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 21, 2025 |
| Apr 16, 2025 | A | Apt 6H · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 20, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2 | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | May 10, 2025 |
| Apr 16, 2025 | C | Apt 6H · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 4th ROOM FROM EAST LOCATED AT APT | May 10, 2025 |
| Apr 14, 2025 | A | Apt 5P · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | Jul 18, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING & EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING & EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING & NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CLOSET CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 10, 2025 | B | Apt 5P · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 15, 2025 |
| Apr 9, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 14, 2025 |
| Apr 9, 2025 | B | Apt 5P · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | May 14, 2025 |
| Mar 13, 2025 | B | Apt 6P · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Apr 17, 2025 |
| Mar 13, 2025 | B | Apt 6P · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Apr 17, 2025 |
| Mar 13, 2025 | B | Apt 6P · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Apr 17, 2025 |
| Dec 26, 2023 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Jan 30, 2024 |
| Dec 26, 2023 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Jan 30, 2024 |
| Oct 12, 2022 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 16, 2022 |
| Oct 12, 2022 | B | Apt 5P · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 16, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 10:50 PM ET. BBL 3059270031.