3 floors · 4 apartments · 3,800 sq ft · built 1931 · class S4 · owner of record: 741 Myrtle Avenue Realty Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 7, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER VIO #111825PI30302HZ AND CONTROL #348365 DATED 11/18/2025. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH CODE. #35719021Y | Apr 1, 2026 DEFAULT | $25,000 |
| Oct 18, 2017 | Construction CLASS - 2 WORK WITHOUT A PERMIT.NOTED:INSTALLED ILLUMINATED BUSINESS SIGN @ EXP#1 APPROX 18'X'15 READS "SECURED".EVIDENCE ATTACHED.REM:OBTAIN ALL THE REQUIRED PERMITS. #35294122M | Dec 4, 2017 WRITTEN OFF | $0 |
| Aug 7, 2017 | Construction CLASS - 2 WORK W/O PERMIT. NOTIED SIGN ON FRONT OF BLDG ON MYRTLE AVE INSTALLED W/O PERMIT. REMEDY: OBTAIN ALL REQUIRED PERMITS. #35287198N | Nov 6, 2017 WRITTEN OFF | $0 |
| Apr 18, 2017 | Construction CLASS - 2 WORK WITHOUT A PERMIT.NOTE:A LUMINATED SIGN INSTALLED"SECURED"AT BUSINESS ENTRANCE APPROX.20FT FROM ONE CURB 18" HIGH AND 15FT WIDTH.REM:OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION. #35235339N | Sep 11, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 18, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#348326 VIO#101625PI30301SB DATED 10/16/25 REQUIRING OWNER TO PROVIDE A CORRECTION ACTION PLAN BY 10/30/25 AND AS OF TODAY'S DATE 11/18/25 THE REQ'D DOCUMENTS-CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER AND SUBMIT ALL DOCUMENT TO PROACTIVEINSP@BUILDINGS.N #PI30302HZ | DOB VIOLATION - ACTIVE |
| Oct 16, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D(14 DAY CAP)OBSVD @ EXP1 MASONRY/STUCCO CRACKS BY MAIN ENTRANCE @ EXP1/2 CORNER, THE FIRE ESCAPE ON 3FL IS MISSING THE TOP STEP. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & DETERMINE THE STRUCT STAB & SUBMIT A CORRECTIVE ACTION PLAN BY 10/30/25, BLDG T #PI30301SB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 10:44 PM ET. BBL 3017370040.