4 floors · 7 apartments · 6,000 sq ft · built 1936 · class C7 · owner of record: Real Estate 7407 5th Avenue Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39178473L AS OF 7/28/2026., FILE A CERTIFICATE #39197854Z | Nov 18, 2026 PENDING | $1,250 |
| Jul 28, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39178471H AS OF 7/28/2026., FILE A CERTIFICATE #39197851N | Nov 18, 2026 PENDING | $1,250 |
| Feb 26, 2026 | Construction CLASS - 2 NOTED: 4 STORY MIXED-USE BUILDING. AT 3RD FL APT 6, INTERIOR EXPOSED BRICK WALL DETERIORATED WITH OPEN AND MISSING MORTAR JOINTS; BRICKS AGED AND POROUS WITH LOOSE PARTICULATE MATTER CREATING AIRBORNE CONDITION #39178472J | Jan 11, 2027 PENDING | $1,250 |
| Feb 26, 2026 | Construction CLASS - 1 ATOI, OBSERVED 4-STORY MIXED-USE BUILDING. ON THE 3RD FL APT 6, A FREESTANDING CAST IRON RADIATOR OBSERVED PLACE DIRECTLY IN-FRONT OF AND BENEATH A REQUIRED EGRESS WINDOW PROVIDING ACCESS TO THE FIRE ESCAPE THE #39178473L | Jan 11, 2027 PENDING | $2,500 |
| Feb 26, 2026 | Construction CLASS - 1 ATOI, OBSERVED AT A 4-STORY MIXED-USE BUILDING, EXTERIOR REAR METAL FIRE ESCAPE AT EXPOSURE 3 IN SEVERE DISREPAIR. TREADS, LANDINGS, GUARD RAILS, AND SUPPORTING MEMBERS EXHIBIT HEAVY CORROSION AND RUST SCALING #39178471H | Jan 11, 2027 | $5,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 23, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY CEMENTS AT GROUTS JOINTS OF BRICK WORKS AT EAST AND SOUTH WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 28, 2026 |
| Apr 23, 2026 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING, IN THE FOYER LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 27, 2026 |
| Apr 23, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FASCIAL PLATE AT EXTERIOR SIDE DOOR LOCKING DEVICE ASSEMBLY AT THE APARTMENT DOOR, IN THE ENTRANCE LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 28, 2026 |
| Apr 23, 2026 | B | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST AND SOUTH WALLS, IN THE KITCHENETTE LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 28, 2026 |
| Apr 23, 2026 | A | Apt 6 · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING, GROUTS JOINTS OF THE CERAMIC TILES AT EAST, SOUTH AND WEST WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 27, 2026 |
| Apr 23, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE AND LEANED AIR VALVE OF THE RADIATOR 1ST FROM NORTH AT EAST IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 28, 2026 |
| Apr 23, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE AND LEANED AIR VALVE OF THE RADIATOR 1ST FROM EAST AT SOUTH, IN THE 2nd ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 28, 2026 |
| Jan 12, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND WINDOW WOOD FRAME AT 1ST AND 2ND WINDOW FROM NORTH AT EAST IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2026 |
| Jan 12, 2026 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND WOOD FRAME AT WINDOW AT SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2026 |
| Jan 12, 2026 | B | Apt 6 · § 27-2005 HMC: REFIT UPPER SASH WINDOW AT SOUTH IN THE BATHROOM LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2026 |
| Dec 30, 2024 | C | Apt 7 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 25, 2025 |
| Dec 30, 2024 | C | Apt 7 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 25, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 28, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39178473L AS OF 7/28/2026., FILE A CERTIFICATE | Open |
| Jul 28, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39178471H AS OF 7/28/2026., FILE A CERTIFICATE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 6:12 PM ET. BBL 3059310010.