| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 776,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1017). Agency page | Dec 31, 2027 in 427 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 5, 2026 | Unknown CLASS - 1 AN INCIDENT THAT OCCURRED ON 05-27-2026 AT THIS JOBSITE WHERE WORKER CUT HIS LEG WHILE USING CHOP SAW AMBULANCE CALLED, UPON REVIEW DEPARTMENT RECORD IT WAS REVEALS THAT GENERAL CONTRACTOR FAILED TO SUBMIT REPO #39555107M | Aug 13, 2026 IN VIOLATION | $2,500 |
| May 27, 2026 | Construction CLASS - 1 INCIDENT OCCURRED WHILE WORKER DIDN'T FOLLOW THE SAFETY PROCEDURES AFTER REBAR CUTS AND LEFT THE CHOP SAW ON THE FLOOR WITHOUT ENSURING THAT CUTOFF WHEEL FULLY STOPPED. THE MOVING 14-INCH DIAMETER ABRASIVE META #39554693J | Mar 11, 2027 | $10,000 |
| Mar 9, 2026 | Construction CLASS - 1 LIFT DIRECTOR MICHAEL JAQUEZ LIC#000082 FAILED TO PERFORM HIS DUTIES WHILE USING TOWER CRANE CD5032 PERMIT#34925 .THE CRANES CLEARANCE WAS CONTRARY TO DESIGN DRAWINGS FROM THE E.O.R. THE DESIGN DRAWINGS SHOWS T #39180002H | Jan 21, 2027 | $2,500 |
| Mar 9, 2026 | Construction CLASS - 1 RNC INDUSTRIES GC#604161 WAS USING TOWER CRANE CD5032 PERMIT#34925 CONTRARY TO DESIGN DRAWINGS FROM THE E.O.R. THE DESIGN DRAWINGS STATES/SHOWS THAT THEY MUST HAVE 9' OF CLEARANCE .AT THE TIME OF INSPECTION THE #39179948K | Jan 21, 2027 | $2,500 |
| Mar 9, 2026 | Construction CLASS - 1 HMO RICHARD A CATALDO JR HMO#010131 WAS OPERATING TOWER CRANE CD5032 PERMIT#CN34925 WITH A DEFECTIVE BOOM HOIST RATCHET AND PAWL WHICH PREVENTS THE BOOM FROM FALLING WHEN THE BOOM HOIST BRAKES FAILED. HE DID NO #39179945P | Dec 17, 2026 PENDING | $2,500 |
| Nov 3, 2025 | Cranes and Derricks CLASS - 1 DURING AUDIT OF CRAWLER CRANE LR1250 CN50024 CD4498 IT WAS DETERMINED THAT HMO SUPERVISOR GEORGE KUNKEL LIC#5707 ASSIGNED TO TRAIN TRAINEE DAVID SANCHEZ LIC#9873 ON A CLASS B CONFIGURED CRANE, LACKED THE REQUIR #39165731M | Nov 16, 2026 PENDING | $10,000 |
| Jun 6, 2024 | Unknown CLASS - 2 AT THE TIME OF MY INSPECTION OF A 52 STORY BUILDING AT FOUNDATIOT LEVEL (APPROX 44,8371 SQUARE FEET) SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY.UPON SHOUTING AND BANGING ON FENCE TO ALERT WATCHPERSONS #39529358H | Jan 27, 2025 IN VIOLATION | $0 |
| Mar 19, 2024 | Construction CLASS - 2 I OBSERVED A FIRE HYDRANT IN USE AT EXPOSURE 1 WITH NO ACTIVE DEP PERMIT (8TH AVENUE) .WITH REVIEW OF DEP COMMUNICATIONS FOR PERMIT USE. HYDRANT ID : H110272 WAS DENIED FOR USE DUE TO A NEED FOR A CONSTRUCTION #39526587H | Jun 27, 2024 IN VIOLATION | $0 |
| Mar 1, 2024 | Construction CLASS - 2 FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES.AS NOTED:AT THE TIME OF INSPECTION AN ACTIVE JOBSITE OBSERVED CONCRETE TRUCK WASHOUT AT EXPOSURE# 1 ONTO THE STREET CONTRARY TO BC 3303.15.1 WHICH SHO #35682122R | May 21, 2026 IN VIOLATION | $2,500 |
| Jun 30, 2023 | Unknown CLASS - 1 A PIECE OF REBAR FELL AND HIT WORKER'S HEAD AND TAKEN TO OFF SITE MEDICAL FACILITY. PERMIT HOLDER JOB#121208326 FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS BY CODE 28-103.21 PER 28-103.2 #39519041K | Sep 14, 2023 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |