1.75 floors · 1 apartments · 1,991 sq ft · built 2001 · class M1 · owner of record: Congregation Chasidei Belz Staten Island
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 11, 2024 | Construction CLASS - 1 FAILURE TO OBEY A SWO. FINISH SIDING, SHEATHING AND WINDOWS INSTALLED AT EXP 2 AND 3., COMPLY WITH STOP WORK ORDER #39127293Y | Mar 15, 2027 | $5,000 |
| Nov 21, 2022 | Construction CLASS - 1 OBSERVED AT T.O.I. AN ENLARGEMENT IS BEING ADDED TO THE REAR OF THE BUILDING. STRUCTUAL STEEL AND METAL FRAMING HAVE BEEN INSTALLED. NO ACCESS TO INTERIOR WAS GAINED. WORK PERFORMED WITHOUT PROPER PERMITS.VIOLA #39074225X | May 15, 2023 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:20 AM ET. BBL 5008110026.