3 floors · 3 apartments · 2,841 sq ft · built 2005 · class C0 · owner of record: Cooper Gardens Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 19, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. FAILURE TO COMPLY W/THE COMM'S ORDR CONTAINED IN SUMMONS/VIO#35475160X ISSUED ON 6/28/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. #35522806P | Dec 20, 2021 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Apr 27, 2022 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321492540 ON 4/18/22 DUE TO APPLICATION WITHDRAWAL. NO ACCESS, WORK APPEARS TO 0% COMPLETE. #22-01235 | DOB VIOLATION - ACTIVE |
| Apr 27, 2022 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321492540 ON 4/18/22 DUE TO APPLICATION WITHDRAWAL. NO ACCESS, WORK APPEARS TO 0% COMPLETE. #22-01236 | DOB VIOLATION - ACTIVE |
| Oct 2, 2020 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #337366 ISSUED ON 6/29/20 TO REPAIR ALL RAILINGS AND FILE AND SIGN OFF REPAIR JOB BY 7/15/20.AS OF 10/2/20 NO REPR JOB HAS BEEN FILED WITH THE DEPARTMENT.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER # 337366 #FEU30402XC | DOB VIOLATION - ACTIVE |
| Jun 29, 2020 | CONSTRUCTION EMERGY WORK:BLDG HAS 2 BALCONIES AT REAR WITH DEFECTVE RAIL ALL AROUND THEM@FRONT OF BLDG IS A STOOP FRM GRUND TO 2FL ENCLS'D WITH A DEFECTVE RAIL.RAIL ANCHORS CONTRARY TO CODE&ARE NOT PROP ATTCH TO SOLID SUBTRAT OWNR ENGAGE NYSPE ENG'R &CONTR TO SECURE ALL RAILINGS AT BLDG TO CODE WORK PERF UNDER C #FEU30402XC | DOB VIOLATION - ACTIVE |
| Nov 16, 2017 | CONSTRUCTION STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE CONTACT THE BOROUGH COMMI SSIONER'S OFFICE AT 718 802-3677 #0405VB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 4, 2026 | C | § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT METAL GATE AT BUILDING FRONT YARD | Jun 10, 2026 |
| Sep 26, 2023 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 31, 2023 |
| Dec 15, 2021 | A | Apt 3 · § 27-2005 ADM CODE REFIT SLIDING DOOR LEADING TO THE BALCONY IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY | Mar 20, 2022 |
| Dec 15, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE THREAD 7 FROM BOTTOM AT PUBLIC HALL STAIRS, 1st STORY | Jan 19, 2022 |
| Dec 13, 2021 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY | Jan 8, 2022 |
| Dec 13, 2021 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASEBOARD HEATERS IN ALL ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY | Jan 17, 2022 |
| Dec 13, 2021 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING NEAR SKY LIGHT IN THE KITCHEN LOCATED AT APT 3, 3rd STORY | Jan 17, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:07 PM ET. BBL 3034330057.