6 floors · 7 apartments · 10,468 sq ft · built 2023 · class D6 · owner of record: 735 5th Ave Construction Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 14, 2024 | Construction CLASS - 2 CONTRACTOR FAILED TO PROVIDED FLAGGERS AT EXPOSURE #1 FOR SIDEWALK OCCUPANCY AS PER SITE SAFETY PLAN. OBSERVED NO PEDESTRIANS WALKING IN THE STREET W/ OUT THE REQUIRED FLAGGERS, TO CROSS PEDESTRIANS SAFELY TO O #39534406J | Jan 12, 2027 DEFAULT | $3,125 |
| Oct 22, 2024 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO HANDRAILS. AT THE TIME OF MY INSPECTION OF A ACTIVE JOBSITE WITH 10 WORKERS OF VARIOUS TRADES I OBSERVE THAT THERE WERE NO HA #39533691N | Jan 12, 2027 DEFAULT | $12,500 |
| Jul 22, 2024 | Construction CLASS - 2 NO RECENT AMENDED EN AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED IN THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/CODES/ #39119530Z | Oct 14, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 5, 2025 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00297 | DOB VIOLATION - ACTIVE |
| Mar 2, 2001 | CONSTRUCTION HAZARDOUS #07HD03 | DOB VIOLATION - ACTIVE |
| Mar 2, 2001 | CONSTRUCTION HAZARDOUS #07HD05 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 5, 2025 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:42 AM ET. BBL 3006490040.