2 floors · 4 apartments · 3,075 sq ft · built 1930 · class C3 · owner of record: Bk Sheffield Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 24, 2022 | C | Apt 2R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Apr 17, 2022 |
| Mar 23, 2022 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2022 |
| Mar 23, 2022 | C | Apt 2R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 29, 2022 |
| Mar 23, 2022 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 18, 2022 |
| Mar 23, 2022 | C | Apt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 18, 2022 |
| Mar 23, 2022 | B | Apt 2R · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2022 |
| Jun 11, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING FRESH AIR VENT COVER FRONT OF BLDG AT SOUTH. | Jul 16, 2008 |
| Jun 11, 2008 | B | D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING FRONT OF BLDG 50 WATTS. | Jul 16, 2008 |
| Jun 11, 2008 | B | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 50 WATTS NIGHT INSPECTION. | Jul 16, 2008 |
| Jun 11, 2008 | B | § 242 M/D LAW PROVIDE UNDER COMPLETED PERMIT,A PROPER ENCLOSURE WITH FIREPROOF SELFCLOSING DOORS AND ASSEMBLIES,AT THE TOP AND THE BOTTOM OF THE CELLAR STAIRS, CELLAR CENTER. | Jul 16, 2008 |
| Jun 11, 2008 | B | Apt 4 · D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASH BASIN BATH & TUB BATHROOM 2 STY APT 4. , SECTION '' '' | Jul 16, 2008 |
| Jun 11, 2008 | B | § 27-2040 ADM CODE INSTALL AND MAINTAIN SUFFICIENT LIGHT OR LIGHTS OF AT LEAST 100 WATTS INCANDESCENT OR EQUIVALENT EACH, TO LIGHT ADEQUATELY FROM SUNSET TO SUNRISE THE OUTH YARD NIGHT INSPECTION. | Jul 16, 2008 |
| Jun 11, 2008 | B | § 27-2040 ADM CODE INSTALL AND MAINTAIN SUFFICIENT LIGHT OR LIGHTS OF AT LEAST 100 WATTS INCANDESCENT OR EQUIVALENT EACH, TO LIGHT ADEQUATELY FROM SUNSET TO SUNRISE THE EAR YARD NIGHT INSPECTION. | Jul 16, 2008 |
| Jun 11, 2008 | B | D26-19.07 ADM CODE INSTALL AND MAINTAIN SUFFICIENT LIGHT OR LIGHTS OF AT LEAST 40 WATTS INCANDESCENT OR EQUIVALENT EACH, TO LIGHT ADEQUATELY FROM SUNSET TO SUNRISE THE SOUTH SIDE YARD. | Jul 16, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 7:57 PM ET. BBL 3043220053.