4 floors · 10 apartments · 6,653 sq ft · built 2007 · class C1 · owner of record: 737 Liberty Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 30, 2019 | Construction CLASS - 1 WORK CONTRARY TO PLANS;I OBSERVED ON SPRINKLER SYSTEM ON 1ST FLOOR 12 SPRINKLER HEADS INSTALLED AND 15 SPRINKLER HEADS INSTALLED ON 2ND FLOOR AND PLANS ON SITE STATED THERE WOULD BE 14 ON 1ST FLOOR AND 13 ON 2N #39006792H | Mar 6, 2020 IN VIOLATION | $2,500 |
| Jul 30, 2019 | Construction CLASS - 1 I OBSERVED IN APT ON 4TH FLOOR PAINTED CONCEALED SPRINKLER HEAD IN CEILING PAINTED ON BRAND NEW SPRINKLER SYSTEM WHICH IS PROHIBITED AND NOT CODE COMPLAINT ; 28-301 , COMPLY WITH CODE #39006791X | Mar 11, 2020 IN VIOLATION | $625 |
| Jun 18, 2019 | Site Safety CLASS - 1 NO SUPERINTENDENT. AT TIME OF INSPECTION OF A 4STORY ALT CURRENTLY AT TOP LEVEL I OBSERVED ACTIVE SITE WITH APPRX 304 WORKERS W/O NO SUPER INTENDENT PRESENT ON JOB AS REQUIRED. STOP ALL WORK ENTIRE SITE.RMDY: #35436834L | Nov 19, 2021 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14060 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35084 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #25300 | DOB VIOLATION - ACTIVE |
| Mar 13, 1989 | BOILER #70673 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 8:56 AM ET. BBL 3039710047.