2 floors · 2 apartments · 3,920 sq ft · built 1965 · class K4 · owner of record: Pcnf Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 23, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39073922R. NO PERMIT ON FILE AS OF 4/23/2026., COMPLY WITH COMMISSIONER'S ORDER #39185873X | May 20, 2027 DEFAULT | $6,280 |
| Nov 12, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. 3 ECB VIOLATIONS # 39144213J ISSUED :4/8/25 BY BADGE#3454 / 39073922R ISSUED :11/15/22 BY BA #39166630H | Dec 15, 2026 DEFAULT | $6,250 |
| May 13, 2025 | Construction CLASS - 2 WORK WITHOUT PERMIT .AT TIME OF INSPECTION I OBSERVED AT REAR IN BACKYARD EXPO.3 A GALVANIZED STEEL FRAME TENT APPROX. 40 FT (L) X 20FT(W)X20''(H) HAS BEEN ERECTED WITHOUT PERMIT ON FILE ., OBTAIN ALL PERMITS #39147779M | Nov 12, 2025 DEFAULT | $6,250 |
| Apr 8, 2025 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 WORK WITHOUT A PERMIT VIOLATION 39073922R ISSUED ON 11/15/22 FOR CREATING A METAL FRAMED STRUCTURE WITH ELECTRIC, AND PLUMBING INSTALLED. NO PERMITS ISSUED FOR T #39144196R | Apr 21, 2026 DEFAULT | $12,500 |
| Apr 8, 2025 | Construction CLASS - 3 WORK WITHOUT PERMIT; OBSERVED METAL FRAMED CANOPIES ATTACHED TO BUILDINGS FACADE AT EXP 1 AND 4. EXP 1 CANOPY IS COVERING OUTDOOR DINING SEATING, EXP 4 CANOPY USED AS WALK WAY., OBTAIN PERMIT OR RESTORE PREMISE #39144213J | Apr 21, 2026 DEFAULT | $500 |
| Nov 15, 2022 | Construction CLASS - 1 WORK WITHOUT PERMIT. OBSERVED ACTIVE CONSTRUCTION NEWLY ERECTED METAL FRAME STRUCTURE WITH ROOF DOOR WINDOW. STRUCTURE IS APPROXIMATELY 18"H - 24"W- 35"L WITH LIGHT FIXTURES AND CHANDELIERS INSIDE AND PLUMBING #39073922R | Sep 13, 2023 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02434 | DOB VIOLATION - ACTIVE |
| May 20, 2016 | CONSTRUCTION #CN0301RM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:22 PM ET. BBL 5078680016.