2 floors · 3 apartments · 3,640 sq ft · built 1920 · class C0 · owner of record: Jarvis, Michael
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 8, 2024 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS#39024409P ISSUED ON 06/23/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01., COMPLY WITH COMMIS #39102978X | Jul 26, 2024 DEFAULT | $6,250 |
| Jun 23, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN FIRE PROOFING ON THE FIRST FLOOR. ALL FIRE PROTECTION WAS REMOVED FROM THE CEILING AND SOME PARTS OF THE FINISHED FLOORING WAS REMOVED., PROVIDE/MAINTAIN FIRE STOPPING; OBTAIN AND INSTALL FI #39024409P | Aug 7, 2020 DEFAULT | $12,500 |
| Jun 23, 2020 | Construction CLASS - 1 INTERIOR CONSTRUCTION WORK WITHOUT PERMIT, NEW WOOD FRAMING OF PARTITION WALLS, FULL DEMOLITION OF THE FIRST FLOOR AND PARTS OF THE SECOND FLOOR REAR. NEW PLUMBING INSTALLATION W/O PERMIT, OBTAIN PERMIT; STOP A #39024413H | Aug 7, 2020 IN VIOLATION | $2,500 |
| Jun 23, 2020 | Unknown CLASS - 1 NEW ELECTRICAL WIRING, JUNCTION BOXES, NEW IC LIGHT BOXES ON THE CEILING, NEW BOX SWITCHES, FIVE NEW ELECTRICAL METERS, AND NEW TEMP ELECTRICAL WIRING INSTALLED DURING CONSTRUCTION WORK, OBTAIN PERMIT; STOP ALL #39024415L | Aug 7, 2020 IN VIOLATION | $800 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Jun 5, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 8, 2025 |
| Apr 3, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 7, 2024 |
| Mar 17, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 20, 2023 |
| Feb 18, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | May 24, 2022 |
| Apr 5, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 9, 2021 |
| Nov 7, 2011 | C | Apt 1 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER (TEMP 170 DEG F) AT THE FIXTURES IN THE KITCHEN AND BATHROOM. LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 13, 2011 |
| Nov 7, 2011 | B | Apt 1 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1, 1st STORY, APARTMENT AT EAST | Dec 12, 2011 |
| Nov 7, 2011 | B | Apt 1 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE FOYER LOCATED AT APT 1, 1st STORY, APARTMENT AT EAST | Dec 12, 2011 |
| Nov 7, 2011 | A | Apt 1 · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS LITE AT THE ENTRANCE DOOR TO THE APARTMENT IN THE ENTRANCE LOCATED AT APT 1, 1st STORY, APARTMENT AT EAST | Feb 10, 2012 |
| Nov 7, 2011 | A | Apt 1 · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WATER CLOSET TANK COVER IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 10, 2012 |
| Nov 7, 2011 | A | Apt 1 · SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 10, 2012 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 7:15 PM ET. BBL 2035940021.