3 floors · 2 apartments · 3,356 sq ft · built 1915 · class S2 · owner of record: Jiaen Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-06-10 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 27, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39161170N AS OF 7/27/2026., FILE A CERTIFICATE #39197706R | Oct 7, 2026 DEFAULT | $1,280 |
| Jul 27, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39161169X AS OF 7/27/2026., FILE A CERTIFICATE #39197697Y | Oct 7, 2026 DEFAULT | $1,280 |
| Jul 8, 2026 | Construction CLASS - 2 AT APPROX 3PM OBSERVED AWNING AT EXPO 1. (PAPA KANFA/JUICE TIME) IS UP AND 100% COMPLETE. NO PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN ALL PERMITS #39195301J | Sep 16, 2026 DEFAULT | $1,280 |
| Sep 22, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER, AT EXP#4 OF THE PROPERTY OBSERVED EXCESS CONSTRUCTION DEBRIS CONSISTING OF MISCELLANEOUS PIECES OF TRASH AND COMBUSTIBLE MATERIALS; STACKS OF WOOD, FURNI #39161170N | Nov 26, 2025 DEFAULT | $12,500 |
| Sep 22, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY, ATOI OBSERVED MISCELLANEOUS PIECES OF TRASH AND COMBUSTIBLE MATERIALS CONSISTING OF STACKS OF WOOD, FURNITURE, BLACK TRASH BAGS AND BRICKS BLOCKING THE FIRE ESCA #39161169X | Nov 26, 2025 DEFAULT | $6,250 |
| Apr 2, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION I OBSERVED MECHANICAL AIR DUCTS VENTS INSTALLED INSIDE COMMERCIAL SPACE AND DUCKS EXTENDED TO THE ROOF ON THE FACADE WALL AT THE REAR YARD WORK WITHOUT PERMIT NO DOCUMENT FILE WITH THE DEP #39143692L | Dec 12, 2025 DEFAULT | $6,250 |
| Apr 2, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED FOUR A/C SPLIT UNITS INSTALLED WITH ELECTRICAL DISCONNECT BOXES TO PROVIDE POWER TO THE UNIT AT EXPOSURE 3 WITHOUT ELECTRICAL PERMIT ON FILE WITH THE DEPT OF BUILDINGS, OBTAIN PER #39143691J | Dec 12, 2025 DEFAULT | $4,000 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00478 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01300 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00504 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01382 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00609 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for HP Device | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 27, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39161170N AS OF 7/27/2026., FILE A CERTIFICATE | Open |
| Jul 27, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39161169X AS OF 7/27/2026., FILE A CERTIFICATE | Open |
| Jul 8, 2026 | ECB | Construction: AT APPROX 3PM OBSERVED AWNING AT EXPO 1. (PAPA KANFA/JUICE TIME) IS UP AND 100% COMPLETE. NO PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN ALL PERMITS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:15 AM ET. BBL 3059200006.