6 floors · 204 apartments · 141,500 sq ft · built 1928 · class N2 · owner of record: Junius-Liberty Development Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 141,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3679). Agency page | Dec 31, 2029 in 1166 days | Next due 2029 |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 3, 2026 | Construction CLASS - 1 OBSERVED THROUGHOUT THE BUILDING GAS DRYERS EXHAUST VENTS ARE NOT PROPERLY SEALED TOILET SEATS ARE NOT OPEN-ENDED AND THERE'S NO INSULATION AROUND TRAPS IN BATHROOM SINKS. IN THE BASEMENT SPRINKLER LINE PENETRA #39175916H | Jan 11, 2027 PENDING | $2,500 |
| Feb 3, 2026 | Construction CLASS - 1 OBSERVED ON THE ROOF IN THE BOILER ROOM WATER LEAKED FROM A PIPE ONTO THE FLOOR. THROUGHOUT THE BUILDING, SPRINKLER HEADS ARE OBSTRUCTED, AND STANDPIPES CAPS ARE MISSING, AND THEIR HOSES ARE TANGLED. ALSO, IN B #39175917J | Jan 11, 2027 PENDING | $2,500 |
| Jan 22, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED ON 1/22/19 AT ABOVE ADDRESS IN SPRINKLER CONTROL ROOM THAT IS LOCATED IN THE BASEMENT BALL DRIP IS CALLED.ALSO LOCATED OUTSIDE ON EXPOSURE 4 FDNY C #35372712N | Apr 29, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #31049 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 29, 2026 | C | Apt 409 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 409, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''west'' | Oct 25, 2026 |
| Sep 29, 2026 | C | Apt 409 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 409, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''west'' | Oct 13, 2026 |
| Jun 6, 2022 | B | Apt 427 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 427, 4th STORY, 3rd B-ROOM FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 6, 2022 | B | Apt 426 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 426, 4th STORY, 4th B-ROOM FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 6, 2022 | B | Apt 423 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 423, 4th STORY, 7th B-ROOM FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 6, 2022 | B | Apt 322 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 322, 3rd STORY, 8th B-ROOM FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 6, 2022 | B | Apt 410 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 410, 4th STORY, 2nd B-ROOM FROM SOUTH AT WEST | Jul 11, 2022 |
| Jun 6, 2022 | B | Apt 428 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 428, 4th STORY, 2nd B-ROOM FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 3, 2022 | B | Apt 318 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 318, 3rd STORY, 1st B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 301 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 301, 3rd STORY, 1st B-ROOM FROM WEST AT NORTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 303 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 303, 3rd STORY, 9th B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 306 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 306, 3rd STORY, 6th B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 307 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 307, 3rd STORY, 5th B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 308 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 308, 3rd STORY, 4th B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 309 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 309, 3rd STORY, 3rd B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 312 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 312, 3rd STORY, 6th B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 315 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 315, 3rd STORY, 4th B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 317 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 317, 3rd STORY, 2nd B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 321 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 321, 3rd STORY, 9th B-ROOM FROM NORTH AT EAST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 326 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 326, 3rd STORY, 4th B-ROOM FROM NORTH AT EAST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 328 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 328, 3rd STORY, 2nd B-ROOM FROM NORTH AT EAST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 332 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 332, 3rd STORY, 3rd B-ROOM FROM WEST AT NORTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 333 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 333, 3rd STORY, 2nd B-ROOM FROM WEST AT NORTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 401 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 401, 4th STORY, 1st B-ROOM FROM WEST AT NORTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 407 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 407, 4th STORY, 5th B-ROOM FROM SOUTH AT WEST | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 412 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 412, 4th STORY, 6th B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 414 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 414, 4th STORY, 5th B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 415 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 415, 4th STORY, 4th B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 416 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 416, 4th STORY, 3rd B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 418 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 418, 4th STORY, 1st B-ROOM FROM EAST AT SOUTH | Jul 8, 2022 |
| Jun 3, 2022 | B | Apt 420 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 420, 4th STORY, 10th B-ROOM FROM NORTH AT EAST | Jul 8, 2022 |
| May 20, 2022 | B | Apt 232 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 232, 2nd STORY, 3rd B-ROOM FROM WEST AT NORTH | Jun 24, 2022 |
| May 20, 2022 | B | Apt 203 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 203, 2nd STORY, 9th B-ROOM FROM SOUTH AT WEST | Jun 24, 2022 |
| May 20, 2022 | B | Apt 216 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 216, 2nd STORY, 3rd B-ROOM FROM EAST AT SOUTH | Jun 24, 2022 |
| May 6, 2022 | B | Apt 228 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 228, 2nd STORY, 2nd B-ROOM FROM NORTH AT EAST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 227 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 227, 2nd STORY, 2nd B-ROOM FROM NORTH AT EAST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 217 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 217, 2nd STORY, 2nd B-ROOM FROM EAST AT SOUTH | Jun 10, 2022 |
| May 6, 2022 | B | Apt 327 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 327, 3rd STORY, 3rd B-ROOM FROM NORTH AT EAST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 310 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 310, 3rd STORY, 2nd B-ROOM FROM SOUTH AT WEST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 430 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 430, 4th STORY, 5th B-ROOM FROM WEST AT NORTH | Jun 10, 2022 |
| May 6, 2022 | B | Apt 528 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 528, 5th STORY, 2nd B-ROOM FROM NORTH AT EAST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 517 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 517, 5th STORY, 2nd B-ROOM FROM EAST AT SOUTH | Jun 10, 2022 |
| May 6, 2022 | B | Apt 509 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 509, 5th STORY, 3rd B-ROOM FROM SOUTH AT WEST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 632 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 632, 6th STORY, 3rd B-ROOM FROM WEST AT NORTH | Jun 10, 2022 |
| May 6, 2022 | B | Apt 609 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 609, 6th STORY, 3rd B-ROOM FROM SOUTH AT WEST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 208 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 208, 2nd STORY, 4th B-ROOM FROM SOUTH AT WEST | Jun 10, 2022 |
| May 6, 2022 | B | Apt 126 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 126, 1st STORY, 2nd B-ROOM FROM NORTH AT EAST | Jun 10, 2022 |
| Apr 14, 2022 | B | Apt 110 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 110, 1st STORY, 1st B-ROOM FROM SOUTH AT WEST | May 19, 2022 |
| Apr 13, 2022 | B | Apt 102 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 102, 1st STORY, 9th B-ROOM FROM SOUTH AT WEST | May 18, 2022 |
| Apr 13, 2022 | B | Apt 101 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 101, 1st STORY, 10th B-ROOM FROM SOUTH AT WEST | May 18, 2022 |
| Apr 13, 2022 | B | Apt 130 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 130, 1st STORY, 1st B-ROOM FROM WEST AT NORTH | May 18, 2022 |
| Apr 13, 2022 | B | Apt 108 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 108, 1st STORY, 3rd B-ROOM FROM SOUTH AT WEST | May 18, 2022 |
| Apr 13, 2022 | B | Apt 109 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT B-ROOM 109, 1st STORY, 2nd B-ROOM FROM SOUTH AT WEST | May 18, 2022 |
| Apr 8, 2022 | C | Apt 603 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Apr 12, 2022 |
| Apr 8, 2022 | C | Apt 603 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Apr 12, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 29, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 409, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''west'' | Open |
| Sep 29, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 409, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''west'' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 7:50 AM ET. BBL 3036790001.