1 floors · 7,545 sq ft · built 1931 · class K1 · owner of record: 729 East Tremont Ave, L L C
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 42 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A SEMI-ATTACHED 1-STORY COMMERCIAL BUILDING WITH CELLAR. LOCATED ON A CORNER LOT, EXP 1 IS ALONG CLINTON AND EXP 2 IS ALONG EAST TREMONT AVE. #35733196R | Dec 4, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD ON EXP1(CLINTON AVE)LEANING PARAPET WALL & AT EXP2/3 CORNER ON(EAST TREMONT AVE)SPALLING STUCCO & CRACKED MAONRY @ THE TOP OF PARAPET WALL.AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVAT #PI20602RJ | DOB VIOLATION - ACTIVE |
| Sep 23, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 ON CLINTON AVE SPALLING DECORATIVE LIMESTONE, MISSING MORTAR, LOOSE PANEL, MISSING MORTAR AROUND CELLAR DOOR ENTRY AND LEANING PARAPET WALL AT EXP2/3 CORNER ON E. TREMONT AVE. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE B #PI20601RJ | DOB VIOLATION - ACTIVE |
| Feb 23, 2023 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION NON-STRUCTURAL DAMAGE OBSERVED TO HAVE BEEN RENDERED TO FRONT WINDOWS, METAL ROLL DOWN GATES AND FRAMES: DUE TO VEHICLE IMPACT. (GLASS SHARDS REMOVED) #23-00508 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 23, 2026 | DOB | CONSTRUCTION: FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD ON EXP1(CLINTON AVE)LEANING PARAPET WALL & AT EXP2/3 CORNER ON(EAST TREMONT AVE)SPALLING STUCCO & CRACKED MAONRY @ THE TOP OF PARAPET WALL.AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVAT | Open |
| Sep 23, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 ON CLINTON AVE SPALLING DECORATIVE LIMESTONE, MISSING MORTAR, LOOSE PANEL, MISSING MORTAR AROUND CELLAR DOOR ENTRY AND LEANING PARAPET WALL AT EXP2/3 CORNER ON E. TREMONT AVE. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE B | Open |
| Sep 23, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A SEMI-ATTACHED 1-STORY COMMERCIAL BUILDING WITH CELLAR. LOCATED ON A CORNER LOT, EXP 1 IS ALONG CLINTON AND EXP 2 IS ALONG EAST TREMONT AVE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 3:23 AM ET. BBL 2030920044.