1 floors · 18,019 sq ft · built 1910 · class W9 · owner of record: Nyc Housing Preservation And Development
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-21 (Payment Verification In Progress). Agency page | Dec 31, 2026 in 58 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 7, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE WITH ACTIVE PERMITS, BUT INADEQUATE ILLUMINATION AS REQUIRED BY BC 3307.6.4.8. THIS CONDITION POSES A RISK OF INJURY TO THE PUBLIC AND INCREASES THE POTENT #39560276J | Dec 17, 2026 PENDING | $2,400 |
| Oct 3, 2024 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE W/LIGHTING IN OPERATING CONDITION CREATE AN UNSAFE CONDITION FOR PEDESTRIAN. 3307.6.4.8 LIGHTING. #39533047M | Mar 17, 2026 POP/IN-VIO | $0 |
| Feb 6, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR OF BUILDING FACADE & APPURTENANCES.NOTE:OBSERVED AT EXP #1 DAMAGED LINTEL LOOSE BRICKS & MISSING WINDOW.AT EXP #2 SEPARATION OF MASONRY & SPALLING BRICKWORK.AT EXP #4 MISSING WINDOW #35670611J | May 4, 2023 POP/IN-VIO | $0 |
| Jul 29, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTE:ATOI OBSERVED@EXP1N ELEVATION@EXP4W ELEVATION:CRACKS,DAMAGED MORTAR JOINTS,DAMAGED WINDOW/SILLS/LINTELS&MISSING WINDOW GLASS@MULTIPLE LOCATIONS.REPAIR DEFEC #35651486X | Nov 3, 2022 POP/IN-VIO | $0 |
| Jun 9, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE:AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE#1(52 ST) CRACK,DAMAGED MORTAR JOINT,MISSING BRICK,DAMAGED WINDOW SILLS AND LINTEL AT MULTIPLE LOCATIO #35651272K | Sep 8, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05088 | DOB VIOLATION - ACTIVE |
| May 8, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. DAMAGED WINDOW SILL @ EXP#4 IN MULTIPLE LOCATIONS. DAMAGED LINTELS IN MULTIPLE AREAS DAMAGED MISSING/COVERED WINDOWS. AT EXP#3 OBSERVED MULTIPLE CRACK, DAMAGED WINDOW SILLS AND BRICK. REMEDY: REPLACE AND/OR REPAIR #SR10401DO | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08541 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE WITH ACTIVE PERMITS, BUT INADEQUATE ILLUMINATION AS REQUIRED BY BC 3307.6.4.8. THIS CONDITION POSES A RISK OF INJURY TO THE PUBLIC AND INCREASES THE POTENT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 2:14 PM ET. BBL 1010800103.