16 floors · 619 apartments · 750,000 sq ft · built 1960 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 750,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2638). Agency page | Dec 31, 2028 in 775 days | Next due 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-05-21) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 23, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING, ...ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04 FISP-3 NOTIFICATION REPORT FILED AS UNSA #35693777L | May 16, 2025 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING, ...ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04 FISP-3 NOTIFICATION REPORT FILED AS UNSA #35693779P | May 16, 2025 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING, ...ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04 FISP-3 NOTIFICATION REPORT FILED AS UNSA #35693775H | May 16, 2025 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING, ...ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04 FISP-3 NOTIFICATION REPORT FILED AS UNSA #35693778N | May 16, 2025 POP/IN-VIO | $0 |
| Apr 23, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING, ...ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04 FISP-3 NOTIFICATION REPORT FILED AS UNSA #35693776J | May 16, 2025 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES BY28-302.4 FOR CONTROL #907707. REMEDY: SUBMIT ACCEPTABLE REQUIRED TECHN #37027282H | May 10, 2024 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES BY28-302.4 FOR CONTROL #907703. REMEDY: SUBMIT ACCEPTABLE REQUIRED TECHN #37027284L | May 10, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 6, 2019 | FACADE SAFETY PROGRAM #HAZ88510 | DOB VIOLATION - ACTIVE |
| Dec 6, 2019 | FACADE SAFETY PROGRAM #HAZ88509 | DOB VIOLATION - ACTIVE |
| Dec 6, 2019 | FACADE SAFETY PROGRAM #HAZ88512 | DOB VIOLATION - ACTIVE |
| Dec 6, 2019 | FACADE SAFETY PROGRAM #HAZ88511 | DOB VIOLATION - ACTIVE |
| Oct 25, 2019 | FACADE SAFETY PROGRAM #HAZ88416 | DOB VIOLATION - ACTIVE |
| Jun 16, 2010 | CONSTRUCTION #0301AK | DOB VIOLATION - ACTIVE |
| Sep 17, 2004 | CONSTRUCTION #STF01SC | DOB VIOLATION - ACTIVE |
| Sep 16, 2004 | CONSTRUCTION #STF02SC | DOB VIOLATION - ACTIVE |
| Jul 1, 1992 | LOCAL LAW 10/80 - FACADE #NRF0941 | DOB VIOLATION - ACTIVE |
| Sep 6, 1990 | ELEVATOR (73) RESTORE TO SERVICE (15) SECOND FLOOR #1303C01 | DOB VIOLATION - ACTIVE |
| Sep 6, 1990 | ELEVATOR (73)RESTORE TO SERVICE (15) LOBBY LEVEL #1303C02 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 6, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Dec 6, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Dec 6, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Dec 6, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Oct 25, 2019 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 20, 2009 | C | Apt 10B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 10B, 10th STORY, 2nd APARTMENT | Aug 15, 2009 |
| Sep 10, 2007 | B | Apt B15 · D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WATER SEEPAGE THROUGH NORTH WALL 15TH STY EAST APT B15 2ND ROOM FROM SOUTH. , SECTION '' '' | Oct 15, 2007 |
| Sep 10, 2007 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR KITCHEN WALL 2ND STY EAST APT 2F. , SECTION '' '' | Oct 15, 2007 |
| Sep 10, 2007 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR BATHROOM WALL 2ND STY EAST APT 2F. , SECTION '' '' | Oct 15, 2007 |
| Sep 10, 2007 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR PRIVATE HALL WALLS 2ND STY EAST APT 2F WEST WALL. , SECTION '' '' | Oct 15, 2007 |
| Sep 10, 2007 | B | Apt 2F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE UNDER WASH BASIN 2ND STY EAST APT 2F. , SECTION '' '' | Oct 15, 2007 |
| Sep 10, 2007 | B | Apt B15 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS 15TH STY EAST APT B15 PRIVATE HALL & BATHROOM. , SECTION '' '' | Oct 15, 2007 |
| Sep 4, 1990 | B | Apt 2F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CLG & WALLS OF 2ND STY SOUTH APT 2F ALL ROOMS. , SECTION '' '' | Oct 22, 1990 |
| Sep 4, 1990 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLG & WALLS OF 2ND STY SOUTH APT 2F ALL ROOMS. , SECTION '' '' | Oct 22, 1990 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:32 PM ET. BBL 2026380090.