5 floors · 73,224 sq ft · built 1910 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page | Dec 31, 2026 in 43 days | 2 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 73,224 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 374). Agency page | Dec 31, 2034 in 2965 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 2 REISSUE#35721047P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:IN THE 3RD FLOOR GYM,THERE ARE VERTICAL CRACKS IN THE BLOCK WALLS AT SEVERAL LOCATIONS.REM:REPAIR/REPLACE. #35734572X | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 12, 2025 | Construction CLASS - 2 RE-ISSUE #35688877M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE GYM AT 3RD FLOOR HAS VERTICAL CRACKS AT SEVERAL LOCATIONS OF THE WALLS. REMEDY: REPAIR/REPLACE. #35721047P | Sep 10, 2025 POP/IN-VIO | $0 |
| Sep 17, 2024 | Construction CLASS - 2 REISSUE #35674868N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT3RD FLOOR. GYM HAVE VERTICAL CRACKS AT WALL AT NUMEROUS LOCATIONS. REMEDY: MAKE NECESSARY REPAIRS. #35688877M | Oct 22, 2024 POP/IN-VIO | $0 |
| Apr 18, 2023 | Construction CLASS - 2 REISSUE#335655131P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY I OBERSERVED THAT AT 3RD FLOOR GYM HAVE VERTICAL CRACKS 'N MASONRY WALL ABOVE WINDOWS VIOLATION #35655131P ISSUED 05/19/20 #35674868N | Nov 2, 2023 POP/IN-VIO | $0 |
| May 18, 2022 | Construction CLASS - 2 REISSUE#35560993R DATE:05.03.2021 FAILURE TO MAINTAIN BUILDING IN CODECOMPLIANT MANNER AT THE TIME OF INSPECTION I OBSERVED THAT AND NOTE 3RD FLOOR GYM VERTICAL CRACKS IN MASONRY WALLS ABOVE WINDOWS & PADDED WA #35655131P | Sep 15, 2022 POP/IN-VIO | $0 |
| May 3, 2021 | Construction CLASS - 2 REISSUE 35495943K FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER NOTE AT 3RD FL GYM VERTICAL CRACKS IN MASONRY WALLS ABOVE WINDOWS & PADDED WALLS.REMEDY: REPAIR AND/OR REPLACE #35560993R | Jul 29, 2021 POP/IN-VIO | $0 |
| Jun 2, 2020 | Construction CLASS - 2 REISSUE#35422247J FAILURE TO MAINTAIN BUILDING INC ODE COMPLIANT MANNER NOET AT 3RD FLOOR GYM VERTICAL CRACKS IN MASONRY WALLS ABOVE WINDOWS AND PADDED WALLS REPAIR AND OR REPLACE #35495943K | Sep 10, 2020 POP/IN-VIO | $0 |
| May 2, 2019 | Construction CLASS - 2 REISSUE #35322511L DATE OF ISSUE 03.12.18. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT 3RD FLOOR GYM VERTICAL CRACKS IN MASONRY WALL THROUGHOUT. RMDY: REPAIR AND/OR REPLACE. #35422247J | Aug 8, 2019 POP/IN-VIO | $0 |
| Mar 12, 2018 | Construction CLASS - 2 REISSUE #35252774M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT 3RD FLOOR GYM, VERTICAL CRACKS IN MASONRY WALL THROUGHOUT. REM: REPAIR/REPLACE. #35322511L | Jul 5, 2018 POP/IN-VIO | $0 |
| Apr 21, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. NOTED: @ 3RD FLR, GYM AREA, VERTICAL CRACKED MASONRY IN THE WALL @ VARIOUS PLACES. REM: COMPLY W/ CODE/REPAIR THE WALL. #35252774M | Aug 14, 2017 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #02604 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #02605 | DOB VIOLATION - ACTIVE |
| Jul 5, 2006 | ELEVATOR #9011/166267 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 4, 2026 | ECB | Construction: REISSUE#35721047P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:IN THE 3RD FLOOR GYM,THERE ARE VERTICAL CRACKS IN THE BLOCK WALLS AT SEVERAL LOCATIONS.REM:REPAIR/REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 5:51 AM ET. BBL 1003740020.