2 floors · 4,446 sq ft · built 1954 · class M9 · owner of record: Schwartz, Tibor
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 24, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39162126K ,NO PERMIT ON FILE AS OF 6/24/2026., COMPLY WITH COMMISSIONER'S ORDER #39193627K | Sep 2, 2026 DEFAULT | $2,530 |
| Jun 24, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39162125Z ,NO PERMIT ON FILE AS OF 6/24/2026., COMPLY WITH COMMISSIONER'S ORDER #39193626Z | Sep 2, 2026 DEFAULT | $2,530 |
| Mar 31, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIOLATION#39059226M ,NO PERMIT ON FILE AS OF 3/31/2026., COMPLY WITH COMMISSIONER'S ORDER #39182659L | Jul 15, 2026 IN VIOLATION | $2,500 |
| Mar 31, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER .FOR WORK WITHOUT A PERMIT FOR VIOLATION#39072670P ,NO PERMIT ON FILE AS OF 3/31/2026., COMPLY WITH COMMISSIONER'S ORDER #39182665H | Jul 15, 2026 IN VIOLATION | $2,500 |
| Oct 1, 2025 | Unknown CLASS - 1 ATOI OBSERVED AT THE FRONT EXTENSION ELECTRIC FIXTURES INSTALLED OVERHEAD. NO PERMITS ON FILE, OBTAIN PERMIT #39162125Z | Jan 4, 2027 DEFAULT | $8,000 |
| Oct 1, 2025 | Construction CLASS - 1 ATOI OBSERVED A HORIZONTAL 1 STORY EXTENTION TO THE FRONT EXP 1. APPROX 32' WIDE AND 12' DEEP X 10' HIGH, OBTAIN PERMIT #39162126K | Jan 4, 2027 DEFAULT | $12,500 |
| Mar 19, 2025 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE FOR WORK WITHOUT A PERMIT VIOLATION 39072670P ISSUED ON 10/25/22 FOR CONSTRUCTING A WOOD FRAMED EXTENSION AT EXP 4. SUMMONS FOUND IN VIOLATION, CIVIL PENALTY NOT PAID, NO PE #39142065H | Jan 5, 2026 IN VIOLATION | $2,500 |
| Oct 25, 2022 | Construction CLASS - 1 WORK W/O PERMIT. AT TIME OF INSPECTION I OBSERVED AT AT EXP#4, ATTACHED ONE STORY STRUCTURE WOOD FRAME (APPROX 500 SQUARE FT) HAS BEEN BUILT TO CREATE AN EXTENSION AT RIGHT SIDE, 40% OF WORK IS DONE. NO PERMIT #39072670P | Mar 15, 2023 IN VIOLATION | $2,500 |
| Mar 30, 2022 | Construction CLASS - 1 WORK W/O PERMIT. OBSERVED AT FRONT ELEVATION AT EXP#1, BUILT A NEW ATTACHED ENCLOSURE ENLARGEMENT APPROX 500 SQUARE FT. THE ENLARGEMENT CONSISTS FROM STRUCTURE WOOD FRAME, DOORS, WINDOW, ROOF. NO PERMIT IN DOB #39059226M | Feb 8, 2023 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 8:00 PM ET. BBL 5007950041.