6 floors · 86 apartments · 84,000 sq ft · built 1924 · class D4 · owner of record: 7201 Owners Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-12 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 84,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5909). Agency page | Dec 31, 2029 in 1163 days | Next due 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #13415 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 6, 2025 | B | Apt B6 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM NORTH AT EA | Nov 10, 2025 |
| Oct 6, 2025 | B | Apt B6 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 10, 2025 |
| Oct 6, 2025 | B | Apt B6 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Nov 10, 2025 |
| Feb 3, 2025 | A | Apt D12 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT D12, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 9, 2025 |
| Feb 3, 2025 | A | Apt D12 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT D12, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 9, 2025 |
| Feb 3, 2025 | A | Apt D12 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT D12, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 9, 2025 |
| Feb 3, 2025 | A | Apt D12 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE BATHROOM LOCATED AT APT D12, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 9, 2025 |
| Oct 3, 2023 | B | Apt A2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Nov 7, 2023 |
| Oct 3, 2023 | C | Apt A2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Oct 29, 2023 |
| Oct 3, 2023 | C | Apt A2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Oct 29, 2023 |
| Oct 3, 2023 | B | Apt A2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 20 SQ FT AT CEILING IN THE KITCHEN LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Nov 7, 2023 |
| Aug 10, 2023 | B | Apt A2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2023 |
| Aug 10, 2023 | A | Apt A2 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 13, 2023 |
| Jan 30, 2019 | B | Apt F10 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL COVER AT CIRCUIT BREAKERS BOX AT WEST WALL, INSIDE WALL CABINET IN THE KITCHEN LOCATED AT APT F10, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Mar 6, 2019 |
| Jan 30, 2019 | A | Apt F10 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT F10, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | May 5, 2019 |
| Jan 30, 2019 | B | Apt F10 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE FOYER LOCATED AT APT F10, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Mar 6, 2019 |
| Jan 30, 2019 | B | Apt F10 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT F10, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Mar 6, 2019 |
| Sep 4, 2018 | B | Apt C8 · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS IN THE ENTRANCE LOCATED AT APT C8, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Oct 9, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:44 PM ET. BBL 3059090001.