Queens · Block 1304 · Lot 43 · 11372

72-22 Roosevelt Avenue

2 floors · 4,180 sq ft · built 1928 · class K2 · owner of record: S & K Siderakis Realty Llc

10open violations
$22,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
56dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 56 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 56 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (10) · $22,500 owed
IssuedViolationHearingBalance
Jul 22, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR 39150807H. THERE ARE NO PLUMBING PERMIT FOR THE TOILET AND SINK CLOSET IN THE INTERIOR RIGHT SIDE OF THE STORE, "RIZQ HALAL PIZZA & TACOS.", COMPLY
#39197178M
Nov 24, 2026
PENDING
$6,250
Jul 22, 2026Construction CLASS - 1
FAILURE TO OBEY AN ACTIVE PARTIAL VACATE ORDER FROM THE COMMISSIONER ISSUED ON 10/30/2024 UNDER COMPLAINT #4977196. OBSERVED AN ACTIVE STORE, "RIZQ HALAL PIZZA & TACOS," OCCUPIED WITH ONE (1) FEMALE EMPLOYEE.,
#39197196X
May 11, 2027
PENDING
$10,000
Jul 22, 2026Construction CLASS - 1
WORK WITHOUT A PLUMBING PERMIT. OBSERVED INSTALLATION OF ONE (1) NEW TRIPLE-COMPARTMENT KITCHEN SINK AND ONE (1) HAND-SINK IN THE INTERIOR LEFT SIDE OF THE STORE, "RIZQ HALAL PIZZA & TACOS.", OBTAIN PERMIT
#39197197H
May 11, 2027
PENDING
$2,500
Jul 22, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128932X., FILE A CERTIFICATE OF CORRECTION
#39197179Y
Nov 24, 2026
PENDING
$1,250
Jun 11, 2025Construction CLASS - 2
FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION NUMBER 39128932X, FILE A CERTIFICATE OF CORRECTION
#39150808J
Sep 30, 2025
IN VIOLATION
$0
Jun 11, 2025Construction CLASS - 1
FAILURE TO COMPLY AND OBTAIN PERMITS TO CERTIFY CORRECTIONS FOR VIOLATION # 39128931Y, COMPLY WITH COMMISSIONER'S ORDER
#39150807H
Jan 7, 2027
PENDING
$2,500
Oct 30, 2024Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED FULL HEIGHT PARTITION CREATING 2 PIECE BATHROOM (TOILET AND SINK)AT 1ST STY COMMERCIAL SPACE. NO PERMITS ON DOB RECORDS FOR THIS WORK., OBTAIN PERMIT
#39128931Y
Jan 7, 2027
PENDING
$0
Oct 30, 2024Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O #000036798 WHICH INDICATES "STORES" AT 1ST STORY LEVEL. AT TIME OF INSPECTION OBSERVED 1ST STORY ARRANGED AS A MASSAGE PARLOR/BROTHEL W/ 4 BEDS SEPARATED BY FLAMMABL
#39128932X
May 27, 2025
IN VIOLATION
$0
Jun 18, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35348737J ISSUED ON 8/30/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTIBLE CERT
#37015279Z
Nov 4, 2019
IN VIOLATION
$0
Aug 30, 2018Construction CLASS - 3
WORK WITHOUT A PERMIT. NOTED: INSIDE THE STORE 9'7" HIGH AND 20' LONG PARTITION IS CONSTRUCTED WHICH IS UP TO CEILING. REAR SIDE OF THE STORE A WOODEN FLOOR WITH JOIST BUILT HORIZONTALLY APPROX - 50FT. THE MIDD
#35348737J
Oct 16, 2018
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 22, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR 39150807H. THERE ARE NO PLUMBING PERMIT FOR THE TOILET AND SINK CLOSET IN THE INTERIOR RIGHT SIDE OF THE STORE, "RIZQ HALAL PIZZA & TACOS.", COMPLYOpen
Jul 22, 2026ECBConstruction: FAILURE TO OBEY AN ACTIVE PARTIAL VACATE ORDER FROM THE COMMISSIONER ISSUED ON 10/30/2024 UNDER COMPLAINT #4977196. OBSERVED AN ACTIVE STORE, "RIZQ HALAL PIZZA & TACOS," OCCUPIED WITH ONE (1) FEMALE EMPLOYEE.,Open
Jul 22, 2026ECBConstruction: WORK WITHOUT A PLUMBING PERMIT. OBSERVED INSTALLATION OF ONE (1) NEW TRIPLE-COMPARTMENT KITCHEN SINK AND ONE (1) HAND-SINK IN THE INTERIOR LEFT SIDE OF THE STORE, "RIZQ HALAL PIZZA & TACOS.", OBTAIN PERMITOpen
Jul 22, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS 39128932X., FILE A CERTIFICATE OF CORRECTIONOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 5, 2026, 7:18 PM ET. BBL 4013040043.

Look up another building